NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #071 Amb. Job # S57-5175
Document / 2 pages

Change Order #71 submission for pump wiring, Feb 1999

Machine-extracted title · confidence 95%

Ambassador Construction submits Change Order #71 to install two 3-phase fields for circulation pumps at the Mayor's Office of Emergency Management.

NYC-WTC_000171639–000171640

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #071 Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000171640
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEB 23 ’99 11:18 FR RNBRSSADOR CONSTR. C0212 949 9762 TO 7325190 P.01Z01 ' 0341S/99 1.3:30 FAX 2122190256 SWANKfe' HAYOEM-CONNELL 62/18/89 14:11 FAX 212 BIS STOP COSKNTINI ASSOCIATES a002/002

tlS ■p' LOCATOR PNL 1 St « ^1-7TT13 : 11^ u' bEz:"” - I 3 ■ u AC-5 H-23M SEE NOTE 1® R7 12 i#6-rc i ILa< -23M 6-rc

OS. u i I’i © Al-

si±‘^4 □ _____ (I <9 Of12 T 23M2 *•; &• 3^ ^2-y4“C •COnI JI u « !>2 ar M 11/ 23M2 CIRC. ij|54-3/4:X- J. I u 3 B U0

I n~uPP-23M2fl6 ’

I IM I

•8 Phttje«!2r . .....

is NO. ■V circulation Pt»P WIRING RC«tBXON OATS 7 WORLD TRADE CENTER REFERENCE OWO: EI.23.DWG □SZETiETa MAYOR’S EMERGENCY SCALE

JOB nOjIBSA OPERATION CENTER consulting: cncxneers sbetcxA OHAWWiVL 23RD FLOOR PART PLAN « TWO IOiN5W.*WaA PVAZA. ME* TORK. RT. I»i2i FSK-E e cMKRetNSG

FEB 18 1999 13:36 2122190256 PAGE.02

** TOTAL PAGE.01 **

NYC-WTC_000171640

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171640Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #059 memo, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000168519

Memo from Ambassador Construction submitting Change Order #059 for $10,948 to install a duplex circuit and drag line on the first floor of 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.948

machine-extracted · confidence unavailable · Check page ↗
Change Order #15 sleeves, 7 WTC, Oct 1998 · Box 7DCAS

NYC-WTC_000168650

Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.946

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168478 · Box 7DCAS

Memo submitting Change Order #71 for $4,579 to install three-phase fields for circulation pumps at 7 World Trade Center.

Filed in the same folder

NYC-WTC_000168519 · Box 7DCAS

Memo from Ambassador Construction submitting Change Order #059 for $10,948 to install a duplex circuit and drag line on the first floor of 7 World Trade Center.

Similar indexed content

NYC-WTC_000168650 · Box 7DCAS

Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.

Similar indexed content

NYC-WTC_000168529 · Box 7DCAS

Memo submitting Change Order #55 for conduit repairs and electrical work at the loading dock and lobby of 7 World Trade Center.

Similar indexed content

Compare copies and versions →