NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management®7 World Trade Center®Change Order #111
Document / 2 pages

Change Order #111 submittal for 7 WTC work, Jan 2000

Machine-extracted title · confidence 90%

Contractor letter submitting Change Order #111 for $17,466 to insulate generator room walls and install heaters.

NYC-WTC_000171504–000171505

Folder label: “Mayor's Office of Emergency Management®7 World Trade Center®Change Order #111

Page image
Scanned page image, NYC-WTC_000171504
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

J Jan 28 ’00 15Ml PR AMBASSADOR CONSTR. C0212 949 9762 TO 6693640 P. 02-^09

AMBASSADOR CONSTRUCTION CO,. INC.

f

January 28, 2000

Mr. yValter Weems Sik^rstein Properties, Inc. 7 W xkJ Trade Center NeVij York. NY 10048

Re; Mayor’s Office Of Emergency Management 7 World Trade Center 'Si Change Order H111

Des r Mr. Weems:

We are pleased to submit herewith our change order # 111 in the amount of SI NTEEN THOUSAND FOUR HUNDRED SIXTY SIX DOLLARS ($17,466.00) to pel the following work at the above referenced premises in accordance with mke Hayden Connell memorandum dated January 20,2000 (See attachment):

lten#1 Am jassador Constnjctton completed Cost $350.00i/

Itei w *2, #3, #4, and #6 She etrock insulation, painting and hardware work Cost -$5,788.00

lteii«6 Tw) (2) electric heaters furnished and installed Cost masjiQ " Subtotal $16,933.00 " General Conditions $1,275.00. >>> " Overhead & Fee $1,032.00 ' 7 C- Insurance $258 00 Total $17,466*00 Ur' h '>

itei #1. #2. and #3 requests from Port Authority are change orders that we have / i all submitted. V. / Continued...-.

317 MADIS ?N AVENUE - NEW YORK. NY 10017 ■ 212 922 1020 • FAX 212 949 9782

NYC-WTC_000171504

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171504Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #067 submission, 7 WTC, Feb 1999 · Box 7DCAS

NYC-WTC_000171464

Ambassador Construction letter dated February 10, 1999, submitting Change Order #067 for $2,694 to assemble cords, relocate speaker strobes, and provide circuits.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.960

machine-extracted · confidence unavailable · Check page ↗
Change order #106 cover letter, Dec 7 1999 · Box 7DCAS

NYC-WTC_000171588

Ambassador Construction cover letter dated December 7, 1999 submitting change order #106 for PESA front panel control installation at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #024R submission, Nov 1998 · Box 7DCAS

NYC-WTC_000171914

Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.958

machine-extracted · confidence unavailable · Check page ↗
Change order submission memo, Jan 2000 · Box 7DCAS

NYC-WTC_000168342

Letter from Ambassador Construction submitting change order #111 for insulation, painting, and heater installation at 7 World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.958

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000174002 · Box 7DCAS

A transmittal letter submitting Change Order #54 for $2,670 for time and material work at 7 World Trade Center.

Similar indexed content

NYC-WTC_000172362 · Box 7DCAS

Ambassador Construction submits Credit Change Order #84 for $30,681 regarding elimination of TV monitors and installation of wall wash fixtures.

Similar indexed content

NYC-WTC_000171464 · Box 7DCAS

Ambassador Construction letter dated February 10, 1999, submitting Change Order #067 for $2,694 to assemble cords, relocate speaker strobes, and provide circuits.

Similar indexed content

NYC-WTC_000168558 · Box 7DCAS

Ambassador Construction submits Change Order #47 to furnish stainless steel flexes for generators at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168532 · Box 7DCAS

Memo submitting Change Order #54 for moving computer equipment to the PIU room on the 23rd floor.

Similar indexed content

Compare copies and versions →