Same-box records
Fuel oil tank room proposal for 120 Wall Street, May · Box 7DCASNYC-WTC_000172854
Proposal from Benjamin Maintenance Corp. dated May 1, 1998 to prime and coat fuel oil tank rooms at 120 Wall Street.
1 shared non-person entities · Same agency, volume and box · similarity 0.900
Change order for electrical riser installation, 7 World Trade Center, · Box 7DCASNYC-WTC_000171626
Proposal to install galvanized conduit and fiber optic cables between the loading dock and 23rd floor LAN room for $45,000.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881
ACE Audiovisual price reduction explanation, 7 WTC OEM, Jun 1998 · Box 7DCASNYC-WTC_000173038
Contractor explains that switching devices were retained despite monitor elimination to ensure equipment functionality.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.880
Revised change order #044R for fuel lines, 7 WTC, March · Box 7DCASNYC-WTC_000171758
Revised change order from Ambassador Construction Company detailing costs and scope for supporting and encasing fuel oil lines at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.879
Fax cover sheet from Ambassador Construction, Nov 1996 · Box 7DCASNYC-WTC_000171963
Facsimile transmission cover sheet from Ambassador Construction Company dated November 30, 1996.
1 shared topics · Same agency, volume and box · similarity 0.878
Change Order #15 sleeves, 7 WTC, Oct 1998 · Box 7DCASNYC-WTC_000168650
Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.
1 shared topics · Same agency, volume and box · similarity 0.876
Change order #106 cover letter, Dec 7 1999 · Box 7DCASNYC-WTC_000171588
Ambassador Construction cover letter dated December 7, 1999 submitting change order #106 for PESA front panel control installation at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.874
Change Order #111 submittal for 7 WTC work, Jan 2000 · Box 7DCASNYC-WTC_000171504
Contractor letter submitting Change Order #111 for $17,466 to insulate generator room walls and install heaters.
1 shared topics · Same agency, volume and box · similarity 0.874
Change Order #55, 7 World Trade Center, Jan 1999 · Box 7DCASNYC-WTC_000168529
Memo submitting Change Order #55 for conduit repairs and electrical work at the loading dock and lobby of 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.873
Change Order #54 for computer equipment relocation at 7 World · Box 7DCASNYC-WTC_000168532
Memo submitting Change Order #54 for moving computer equipment to the PIU room on the 23rd floor.
1 shared topics · Same agency, volume and box · similarity 0.873
ACE Audiovisual proposal reduction letter, 7 WTC OEM, Jun 1998 · Box 7DCASNYC-WTC_000173027
ACE Audiovisual explains price reductions for eliminating monitors while retaining necessary switching devices.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.872
Change Order #55 submission for 7 WTC OEM work, Jan · Box 7DCASNYC-WTC_000173999
A transmittal letter submitting Change Order #55 for $34,954 regarding conduit repairs in the loading dock and lobby of 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.872