5/99 092 7 FAX 2122190256 .... SWANKE HAYDEN CONNELL 121002/005

I SwankeHaydenGonneli Architects

Punch List I Project Name anil Address; Project No; ! 5376A Mayor’s Office: of Emergency Management Project Director/Manager; 7 World Trade ICenter - 23"*, 7“*- & 1 “Flook Meinhardt/Aliotta NewYork^NY Client: Silverstein Properties Inc. i Subject: MOEM Punchlist TTo Chi K. Chu!/ SPI, Walter Weems / SPI From Date Prepared Glen Pymento/DACS, Martin Schneider / AC Juan M. Mejia June 23,1999

J. Aliotta (LhCA) J. Ginsburg, (SHCA) J.VandePhsse(SHCA) J ___________________________________________________ _____ _______________

A walkthrough jwas conducted on 06.21.99 and 06.22.99 at the above-mentioned site and the foUowiiig observations were noted. It is the responsT/ity of the Contractor to fulfill the obligations of the contract whether noted in this report or not. I i

Serv, Elev. Replace tiles (1?) and adjust grid to be light leak proof 23-54 Door silencers missing at double door E.O.C. side _____________ EOC rm, Tip. Adjust joints at metal tiles and replace damage (6) in from of podium (see 23-02 anached rep)______________________________________ Access panel at hurricane wall near watch command door. Door missing pull & (3) wood tiles damaged due to floor stop not being installed.______________ Black scratch at monitor #2 enclosure. Smooth gyp bd. Ceiling at turret near watch command glass door (north side). Right side of podium access panel for hurricane wall hardware is broken and (1)' panel with slobi is stained, needs to be replaced. Monitor #10 metal enclosure needs paiat touch-up on the bottom right side. Monitor #11 enclosure needs touch-up paint at scratch.__________________ Tip AU filler panels at comers for NovaUnk arc missing and by trying to fit them have damaged paint at turret end. Add Mylar sheet at light cove light between monitors 11 & 13 reflector is short by 1"±.___________________________________________________ Access wood panel next to A.V. rack closet not accessible missing hardware Clean gap between stage and Novalink station & install carpet strip.________ Adjust meal panel above monitor #25 is crooked._____________________ " Gjip. Bd. Above monitor #21 at coimcction to meal panel is uneven and needs paint at reveal. Bottom fight of monitor enclosure #19 is damaged needs touch-up paint.______ 3"* perforated panel below glass.from glass door at watch command wall is dented. (Not observed at first punch list) w^5J7e\i\nindoa\|iunciilul»9.0ci.22 pmcliIiitdM

Swanke Hayden Connell Lld./Swanke Huyden Connell & Partners LLP 293 Lafayene Sneer. New York, New York 10012 212 226 9696, Fax 212 219 0059

NYC-WTC_000171237

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171237Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

23rd floor punch list, 7 WTC, June 1999 · Box 7DCAS

NYC-WTC_000173500

Comprehensive punch list compiled by the Mayor's Office of Emergency Management following site inspections of the 23rd floor at 7 World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.915

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000167290 · Box 7DCAS

Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.

Filed in the same folder

Compare copies and versions →