NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/General Design Review Comments
Document / 3 pages

HVAC Verification Form, 7 World Trade Center, April 1998

Machine-extracted title · confidence 90%

Engineer's form requesting verification of tank placement and clearance compliance with NYC code at the facility.

NYC-WTC_000168712–000168714

Folder label: “General Design Review Comments

Page image
Scanned page image, NYC-WTC_000168712
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

H Dep^t Citywide Administrative Services To; Olenn Pymento Sheet 1 of 3 A: Incorpora Contract Number: Consultant: Consentini As;. B-.Kot EJescription: Mayor’s Office Of Emergency 100 %Submiral Management cxplanatioii} Rc\icwcr; JOSEPH Title Mcchanicai Cb-tc; 4/17Z9B C:Clarificat* MENASCE, PE Engineer. Required CoocEir Pkg; . No/ Comments No. S?BC. Pg .

_____________ _____________ HVAC_______________ _ 1 A-1-1 Please verify that the 6000 gal tank can be brou^ ht inside the building. rigged in place, that there is enough room for the 'iVr'clder to work, that it is tn compliance with NYC code section 27-&29 whic h rKjuires a 15" dearancc all around tank and thai it is in compliance with' 'fYS code, Subchaptcr B, part lO(g._____________ _______ ________________________________ 2 A-1-1 Note Water line is shown op-d^ plumbing (hawing.- 3 MI.01 1. What protection is provided against fill pump cavitation in the illustrated fuel oil diagram? 2. Specify the size of&e day tank on the drawirgs or in section 15190. Specify the make and model of the circulatinj; pump for the generators. 3. Shouldn't the vent line for the new emergency'fuel tank be higher than ihetank? 4. Shouldn't the fuel oil return from the day tank be drained to die new storage tank?____________________ | _ 4 M1.Q7 Verify ^tii the Generator raanufechirer the requu^ opening to air cool the” units? 5 1. Arc the Air Handlers in the building serving 23rd floor on emergency gercrators as well? 2. Specify the inake> «55del and size of the coolh j towers. 3. Clarify in the schematic diagram the location r f the backflow preventers to supply make up water to the cooling towers 4. Verify the need, to have exhaust fans for the otTCT conference rooms, like the one facing Verscy Street. 5. Clarify the need to provide fresh air intake to aC-4 <£5. Describe how to achieve free cooling. ___ _

Page I of 3

NYC-WTC_000168712

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168712Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared topics · Same agency, volume and box · similarity 0.926

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

Fire Service Summary Report, n.d. · Box FDNY

NYC-WTC_000169205

Document summarizing fire service activities or inspections performed at the specified location.

Similar document embedding; no shared entity or topic indexed. · similarity 0.915

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000169716 · Box 7DCAS

Technical review comments on final architectural plans for the Mayor's Office of Emergency Management at 7 World Trade Center.

Filed in the same folder

NYC-WTC_000173475 · Box 7DCAS

Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →