NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #024R Amb. Job #S57-5175
Document / 2 pages

Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #024R Amb. Job #S57-5175

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000168615–000168616
Page image
Scanned page image, NYC-WTC_000168615
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

AMBASSADOR CONSTRUCTION CO. INC.

Iff X

.8 % «

November 3, 1998

Mr. Walter Weems I i Silverstein Properties, Inc. 7 World Trade Center New York, NY 10048

RE; Mayor’s Office of Emergency Management 1

7 World Trade Center - 1, 7 & 23rd Floors \ Change Order #024R Amb. Job # S57-5175

Dear Mr. Weems:

We are pleased to submit herewith our revised change order #024R to perform the following work at the above referenced premises for the sum of THREE THOUSAND ONE DOLLARS ($3,001.00):

SCOPE OF WORK

To furnish and install the new switches to control monitors in EOC. as follows;

- Eighteen (18) low voltage switches $612.00 - Forty (40) D-sub mini conductors $560.00 - One (1) installation and termination $1,167.00 - One (1) Miscellaneous cable and hardware $250.00 Subtotal $2,589.00 General Conditions 207.00 Overhead and Fee 168.00 Insurance _ 37.00 Total $3,001.00

We trust the above meets with your approval and we look fonAzard to the continued pleasure of serving you.

Continued. . .

317 MADISON AVENUE, NEW YORK, NY 10017, 212 922 1020, FAX 212 949 9762

NYC-WTC_000168615

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168615Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order #108 cover letter, Dec 17 1999 · Box 7DCAS

NYC-WTC_000171573

Ambassador Construction cover letter dated December 17, 1999 submitting change order #108 for video cable connections at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.984

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #024R submission, Nov 1998 · Box 7DCAS

NYC-WTC_000171914

Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.981

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171914 · Box 7DCAS

Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.

Filed in the same folder

NYC-WTC_000172216 · Box 7DCAS

Submission of Change Order #46 for $2,168 to provide power supply in room 23-50 at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168561 · Box 7DCAS

Ambassador Construction submits Change Order #46 to provide power supply and security equipment circuits at 7 World Trade Center.

Similar indexed content

NYC-WTC_000173879 · Box 7DCAS

A memo submits Change Order #25 for $36,199 to install steel supports and beams for microwave dishes on the roof of 7 World Trade Center.

Similar indexed content

NYC-WTC_000168612 · Box 7DCAS

Ambassador Construction submits Change Order #025 for structural support work on the roof of 7 World Trade Center.

Similar indexed content

Compare copies and versions →