Change Order #40 for rebar work, 7 WTC, Dec 1998

Machine-extracted title · confidence 95%

Ambassador Construction submits Change Order #40 to weld new rebar and chop concrete at 7 World Trade Center.

NYC-WTC_000168576–000168577

Folder label: “Change Order #040 Ambassador Construction

Page image
Scanned page image, NYC-WTC_000168576
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DEC 21 ’98 14=20 FR AMBASSADOR CONSTR. C0212 949 9762 TO 7325190 P.02/06

AMBASSADOR CONSTRUCTION CO . INC

December 21,1998

Mr. Walter Weems Silverstein Properties Inc. 7 World Trade Center New York, NY 10048

Re: Mayor’s Office of Emergency Management 7 World Trade Center Change Order #040 AmKJjohJS57r517.5

Dear Mr. Weems:

We are pleased to submit herewith our change order #040 to perform the following work at the above referenced premises for the sum of TWENTY SIX THOUSAND FOUR HUNDRED TWENTY SEVEN DOLLARS ($26,427.00).

SCOPE OF WORK As per the engineer’s verbal instructions to weld new rebar to existing rebar intrench with 3" over lap at each end. In order to expose the end if the existing rebar, the concrete has to be chopped away. New rebar and welding $7,800.00 Chop existing concrete $15,000.00 Subtotal $22,800.00 General Conditions 1,824.00 Overhead and Fee 1,477.00 Insurance ..... 325.0.0 Total $26,427.00

Aitacnate If welding of rebar has to be performed on Overtime Add $4,080.00

We trust the above meets with your approval and we look forward to the continued pleasure of serving you.

Continued. ..

317 MADISON AVENUE. NEW YORK, NY 10017. 212 922 1020, FAX 212 949 9762

NYC-WTC_000168576

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168576Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #061 memo, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000168510

Memo from Ambassador Construction submitting Change Order #061 for $2,785 to wire auxiliary contacts to magnetic locks and rewire doors at 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.971

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171848 · Box 7DCAS

Letter detailing Change Order #040 to weld new rebar to existing rebar and chop away concrete at the Office of Emergency Management.

Similar indexed content

NYC-WTC_000168558 · Box 7DCAS

Ambassador Construction submits Change Order #47 to furnish stainless steel flexes for generators at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168573 · Box 7DCAS

Ambassador Construction submits Change Order #41 to install revised antenna support details at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168566 · Box 7DCAS

Ambassador Construction submits Change Order #44 to install fuel oil piping and enclosures at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171882 · Box 7DCAS

Ambassador Construction submits Change Order #47 for stainless steel generator flexes to address height restrictions at 7 World Trade Center.

Similar indexed content

Compare copies and versions →