NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/GENERATOR PREPURCHASE SPECIFICATION
Document / 52 pages

Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166896
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

1. Load elements are to be individually serviceable and replaceable from the front of the unit in thg field without major disassembly of the load bank. An acceptable design to satisfy this requirement is the installation of the load elements in slide- out, removable trays in such a way that any element is easily accessed without disturbing any other elements.

2. All materials used in the mounting and installation of the load elements shall be suitable for the temperature encountered, both in normal operation and under fault conditions.

a. Materials in direct contact with the element wire shall be ceramic. These ceramics shall be installed upon and reinforced and supported by stainless steel structures.

b. Other materials which structurally support the load elements and/or form from the hot air duct within which the elements are mounted shall be steel, stainless steel or aluminum.

c. Plastics and glass reinforced plastic materials and flammable materials are not acceptable materials of construction for installation, support and mounting of load elements or in the construction of the load bank hot air duct.

3. Load elements shall be Simplex "Power Web" Brand or other approved.

F. The resistive load shall be fused in branch circuits of not more than 50KW each.

1. Load circuit fuses shall be 200,000 A.l.C. current limiting type, extremely fast acting, 600V rated.

G. Load control shall incorporate one magnetic contactor per each fused branch circuit.

H. Load power wiring shall incorporate 150°C insulated.

1. Main terminals shall incorporate copper, 1000A per square inch.

J. Each load bank shall include a unit controller which provides the following functions:

1. Power supply for load bank control circuits.

OEM PPS-21 Generators 7 WTC March 20, 1998

NYC-WTC_000166896

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166896Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →