Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166890
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

2. The voltage regulator shall incorporate 3-phase true RMS sensing specifically designed for jhe application.

3. The exciution system for the voltage regulator shall utilize a permanent magnet generator, except that a self-excitation system may be utilized where the voltage regulator is of a type specifically intended for non-linear load applications. Such regulator shall not incorporate any SCR's in its circuitry, and it shall be complete with isolation transformers and filtering as noted below.

4. Isolation transformers complete with filtering equipment, shall be provided to minimize the effect of distortion on the voltage relator power supply and sensing circuits, on governor control and supply circuits, on instrumentation and relaying and on other voltage sensing components.

5. Voltage and current sensing devices shall sense true RMS values, and frequency sensing devices shall sense zero crossover.

G. The generator of each generating set shall be equipped with amortisseur windings and other features necessary for parallel operation with other generator sets, and shall be sup­ plied with all appurtenances necessary for operation including the following;-

1. Integrally factory mounted exciter and all other appurtenances necessary for self- contained excitation.

2. Voltage regulator incorporating all features necessary to permit synchronizing and parallel operation of the generating set with other sets. The voltage regulator shall be installed in the generator control switchgear, and shall include provision for manual adjustment.

H. Each emergency generating set shall be arranged to operate as certified and coordinate with conditions and facilities established on the basis of the following assumptions :-

Weight of End Unit- 15,000 lbs. (Ready to Run)

Overall Length of Unit- 15'-O"

Overall Width of Unit- •6'-0"

Overall Height of Unit- lO'-O”

Height of Unit Above Sea Level----- Within 1,000 Ft.

OEM PPS-15 Generators 7 WTC March 20, 1998

NYC-WTC_000166890

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166890Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →