3. If design changes result from either the value engineering or the reliability
studies, are these changes contemplated in your current scope of work?
We have anticipated making the appropriate adjustments to our documents and
designs if the information provided for these sessions is done in a timely
fashion. We recommended in our proposal that the reliability sessfons be done
earlier. The reason we did that was because the timing was such that the
changes could be incorporated into the next phase of our documentation easily.
If in fact there is a reliability session at the conclusion of contract
documents, the prepurchase specifications, final specifications and bid
documents will have been completed. There are major changes at this point, it
could have a major impact on our costs. We have not valued for these types of
changes.
4. How many design alternative studies are included in your fee?
TKLP has not developed their estimated hours to perform this work to include
the level of detail as to how many design alternatives would be included. We
have, however, performed numerous studies in the New York City area and in
other areas of alternatives. We have based this proposal on using these
previously completed studies to assist us in working with our client to
resolve conclusions. The RFP asked how we would arrive at the right answer
first. This is how we will do that, and this will be based on our
experience.
5. Specifically what is included in your scope of work regarding security systems
and conmunications design and installation? What members of your project team
have specific experience in these fields?
As in Question Series I, Item "e", TKLP's design includes a structured cabling
plan for both data and voice services from service entrance points (NPP) to
MDF room and PABX, to computer center and vertical distribution of associated
copper and fiber cables. Communications closets layouts and elevations will
be developed in accordance with agreed-upon standards. Design documents will
•also include associated horizontal cabling from these closets to each station
outlet for combined voice/data use at each workstation and end device (fax,
shared printer, etc.). TKLP will develop all pathways for cable distribution
and tie-in to active network devices.
NYC-WTC_000166565
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000166565Source: NYC Law Department, mirrored locally
Notification of ongoing interviews for design and implementation of information dissemination campaign for Lower Manhattan recovery, including environmental information.