V. Scope of Services / Approach TKLP
the completeness and coordination of the documents as well as serving as a final check for
constructability of the work.
d. Review of Work Product: An independent review of all work products and deliverables is
undertaken by two principals of TKLP, a senior architect and engineer, whose principal
responsibility in the firm is quality assurance, i.e., they have no direct client commitments
which could potentially detract from their quality assurance functions. A written report is
submitted to the CEO, President, and project team, and a written response is required
before work products are given to our clients.
What experience have you had in working with multiple designers utilizing a team approach?
What were the success and problem areas?
TKLP did the MEP design, both core and shell and fitout, with SOM on the Shearson Lehman
Brothers project. The project proved to be a very successful project. A great deal of the success
is attributed to two very professional consultants. A good deal of the success, however, was a
result of a very structured reliability program that TKLP ran that brought to light the needs of
the architecture and the engineering systems to provide the data center with reliable building
services. This created a reliability plan that the two companies could work to. In addition, the
client's management was familiar with both architectural and engineering design and actively
participated.
How zvill you assure constructability of your design?
TKLP's estimating department is made up of individuals who came fron; the construction
business. They review our documentation as it is being developed and at the conclusion of the
deliverables for constructability. A. Ralston's background and family came from the construc
tion industry. He will be reviewing all deliverables before they come to you for constructability
and maintainability. Mike Timmons, our reliability engineer, spent 15 years in construction
prior to coming to TKLP. His last project was the MEP for a large nuclear power station. He
will be reviewing the documentation for constructability, reliability, and maintainability.
TKLP's internal quality control and quality assurance process includes constructability re
views. Our field department, made up of individuals with construction industry backgrounds,
review constructability.
Forest City Tech Place Assodates for Full Engineering Services 05/06/92 [P237] v-n