NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Proposal for Full Comprehensive MEP Engineering Services for Forest City Tech Place Associates
Document / 127 pages

Proposal for MEP engineering services dated May 6, 1992

Machine-extracted title · confidence 90%

Formal proposal document dated May 6, 1992, outlining MEP engineering services provided by an architectural firm.

NYC-WTC_000166571–000166697

Folder label: “Proposal for Full Comprehensive MEP Engineering Services for Forest City Tech Place Associates

Page image
Scanned page image, NYC-WTC_000166630
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

V. Scope of Services / Approach TKLP

Describe the quality control policy of your firm. Please enclose a copy of it with your proposal for our review. TKLP has distinguished between quality control and quality assurance and has established procedures for both.

Quality Control The responsibility for quality control remains with the project team under the direction of the Project Manager throughout a project.

a. A technical check is performed in each discipline and is the responsibility of the discipline project engineers and the project architect. It includes the review of methods and systems, calculations, and dimensional checking. b. A coordination check is performed by the discipline project engineers and the project archi­ tect working in cooperation, and is under the close direction of the Project Manager. The primary purpose of the coordination check is to ensure that all elements of the design fit together and can be built. The second purpose, of equal importance, is to verify that the designs are complete, with­ out gaps or overlaps, and that the work contained within each bid package (drawings and specifications) is precisely defined.

Quality Assurance While the responsibility for quality control remains with the project team throughout the en­ tire project, quality assurance is provided through the following independent procedures:

a. Design Reviews: TKLP's Design Review Committee, composed of senior design " i ff, re­ views projects throughout their development each Monday. Emphasis is placed on the review of projects in the formative, pre^esign, and conceptual stages to assure a sound basis for future design development. All formal project drawings and reports are reviewed prior to presentation to the client. b. Review by the Discipline Leaders: The documentation accomplished by the project team is reviewed by the Discipline Leaders to maintain a high professional standard of quality. The Architectural Leader and Engineering Leader are not committed to specific project team assignments to avoid compromising their flexibility to maintain an overview of all work accomplished in their areas of specialization and to allow them to direct their atten­ tion where and when required. c. Coordination of Documentation: Before issuance of construction bid packages, the documents are reviewed by TKLP's Construction Services Department. This formal review ensures

Forest City Tech Place Associates for Full Engineering Services 05/06/92 [P237] v-io

NYC-WTC_000166630

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166630Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →