NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
NYC-WTC_000166488–000166533Folder label: “NYC DOB WTC Building Code Task Force Findings and Recomendations - Feb. 2003”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
i I
largest span between columns in tie direction or 5h, and h is the clear story height expressed in feet. 3. Exterior horizontal ties should be provided from perimeter columns and walls to floor slabs. Tie comer columns both ways. Tie walls uniformly, or not farther than 18- feet apart and within 9-feet of wall ends. Design strength should be at least the lesser of 6.6F, (or 0.8hF, if less) in units of Kips at columns and 2F, (or 0.12hF, if less) Kips/foot at walls, where h is the story height expressed in feet. 4. Vertical ties should be provided floor to floor at load bearing walls 6-inch minimum thickness, masonry strength 725-psi and maximum slenderness (clear height/thickness) of 20. Tie every 16-feet maximum and 8-feet from unrestrained end of wall. Design tie capacity for the larger of (12.7A)(ha/t)' Kips or 6.85-Kip/foot of wall or per column, where A is the horizontal cross-sectional area in square inches of the column or load-bearing wall including piers, ha is the clear wall height and t is the thickness of column or wall. (2) The Alternate Path Method: Wherever the design cannot accommodate the prescriptive design and detailing requirements of the indirect method, each such key member should be notionally removed, one at a time, to determine that its removal would allow the rest of the structure to bridge over the missing member. These criteria should be satisfied while the building is subjected to its own weight D plus a superposed load of 0.25L and a wind load of 0.2W assumed to be acting in combination. D is computed according to Article 2 of I Subchapter 9 of Chapter 1 of Title 27 of the Administrative Code and according to Reference ! Standard RS 9-1 of the same Code. L is computed according to Article 3 of Subchapter 9 of Chapter 1 of Title 27 of the Administrative Code and according to Reference Standard RS 9-2 of the same Code without allowance for the live load reduction permitted in Article 4 of ! Subchapter 9 of Chapter 1 of Title 27 of the same Code. W is computed according to Article 5 of Subchapter 9 of Chapter 1 of Title 27 of the Administrative Code and according to Reference Standard RS 9-5 of the same Code. Proof that the alternate path method is satisfied while the building is subjected to the loads stipulated in the criteria can be provided by the analysis and/or physical simulation. These criteria should be satisfied in accordance with structural analysis based on the Plastic Design or Ultimate Strength method, representing conditions at incipient failure and considered as an independent check of a building designed in accordance with the usual procedures for L Working Stress, Plastic Design or Ultimate Strength Design pursuant to Subchapters 9, 10 and .11 of Chapter 1 of Title 27 of the Administrative Code and all applicable Reference Standards thereto. (3) The Specific Local Resistance Method: Any single element essential to the stability of the structure, together with its structural connections, should not fail under the loads stipulated in this criterion after being subjected to a project specified abnormal or extreme local loading condition. The structure should be detailed to permit load reversals and the connections should be designed to develop the capacity of the members. If an extreme local loading condition is not specified for the project, the key elements should be detailed to develop the ultimate capacity of the materials in shear, flexure and axial load by means of confinement and continuity of reinforcement for reinforced concrete construction and encasement or stiffeners for rolled steel construction. For a column or other compression element, the interaction between flexure and axial load must be considered when establishing the capacities. In those cases where the stability of the element depend upon the lateral support provided by the attached space dividers, these space dividers, or a portion of these space dividers which can provide adequate lateral support, must also satisfy requirements of this paragraph. These essential elements may respond inelastically to the abnormal or extreme local loading conditions; however it must be demonstrated through appropriate analytical methods that these elements can continue to carry the gravity and lateral loads they support.
Page 34 WTC Building Code Task Force February 2003 Findings and Recommendations
NYC-WTC_000166520
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141695
Section of an environmental assessment describing existing physical conditions and construction impacts at the World Trade Center site.
4 shared non-person entities · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
2 shared non-person entities · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141585
Map showing the condition of buildings at the World Trade Center site as of September 21, 2001.
9 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
4 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168718
Document outlining fire evacuation procedures and objectives for 7 World Trade Center.
3 shared non-person entities · 1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173475
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
6 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
7 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0139.
Cited alongside this record in an Ask answer