1 • ,, * -EMERGENCY —1 PROCEDURES (continued)
SPILLS: In the event of a liquid/solid spill: 1. First aid will be administered to injured/contaminated persons. Any person observing a spill will act immediately to safely remove and protect injured/contaminated persons from any life-threatening situation. First aid and decontamination procedures will be implemented as appropriate.
2. Warn unsuspecting persons/vehicles of the hazard. All personnel will act to prevent any unsuspecting persons from coming in contact with spilled materials by alerting other nearby persons and by obtaining assistance of other personnel who are familiar with spill control and clean-up techniques.
3. Stop the spill at the source, if possible. Without taking unnecessary risks, personnel will attempt to stop the spill at the source. This may involve activities such as uprighting a drum, closing a valve or temporarily sealing a hole with a plug. Personnel will not expend more than a brief effort prior to notilying the Project Manager.
4. Notify the Project Manager. Utilizing available personal radio communications or other rapid communication procedures, the Project Manager will be notified of the spill, including information on material spilled, quantity, personnel injuries and immediate life-threatening hazards. 5. Notify Con Edison. The Project Manager will immediately notify Con Edison’s authorized representative of the spill, and provide him with all pertinent information. Con Edison will contact and notify all appropriate regulatory agencies of the spill. If an on-site Con Edison representative is unavailable, JWC will notify the EH&S-Remediation Project Manager, Allison Meyrowitz (phone: 718-204-4295, pager: 917-317-1256) or Manhattan Substations Environmental Manager, Stuart Hanebuth (phone: 212-664-0680, pager: 917-448-8110).
6. Spill assessment and primary containment. The SHSO will make a rapid assessment of the spill and direct primary containment measure. Depending upon the nature of the spill, primary containment measures may include, but are not limited to: * construction of a temporary containment berm utilizing on-site absorbent material; * digging a sump, installing a polyethylene liner and diverting the spill material into the sump; * placing drums under the leak to collect the spilling material before it flows over the ground; * transferring the material from its original container to another container.
7. The Project Manager will discuss with and obtain the SHSO's concurrence as to secondary spill containment procedures, if necessary. He will make a determination regarding the requirements for notifications of backup response personnel, and State and local officials including emergency response teams, and the National Response Center.
NOTE: Steps 8 through 11 listed below shall be coordinated through Con Edison.
8. Spill clean-up procedures. The Project Manager will develop spill clean-up procedures taking into consideration associated hazards, quantity of spilled material, disposal methods, and costs.
9. Spill clean-up. Personnel will clean up spills following the spill clean-up plan developed by the Project Manager. The Project Manager will supervise the procurement of supplies necessary to clean up a spill. Such items may include, but are not limited to: front end loader, shovels, rakes, clay absorbent, polyethylene, personal safety equipment, steel drums, pumps and miscellaneous hand tools. All material and equipment will be located in the Containment Reduction Zone.
10. Spill clean-up inspection. The Project Manager will inspect the spill site to determine that the spill has been cleaned up satisfactorily. If necessary, soil, water or air samples may be taken and analyzed to demonstrate the effectiveness of the spill clean-up effort.
11, Identify the cause of the spill and remedial action to prevent recurrence. The Project Manager will determine the cause of the spill and determine remedial steps to ensure that recurrence is prevented. The Project Manager will review the cause of the spill and obtain his concurrence with the remedial action plan.
7 WTC HASP 15
NYC-WTC_000165918
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
12 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164671
Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
15 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
12 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150233
Cover page for a laboratory report regarding landfill operations, dated October 2001.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150209
Laboratory report listing PCM and TEM asbestos air sampling results collected on September 26, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145027
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
8 shared non-person entities · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
11 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
9 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
5 shared non-person entities · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
9 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
9 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Cited alongside this record in an Ask answer