NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
NYC-WTC_000165900–000165926
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
, V, ,EMERGENCY PROCEDURES
PERSONNEL EXPOSURE
In the event of chemical exposure to known site contaminants, the MSDS or chemical data sheet, if available, should be consulted first. General practice exposure emergency actions include:
Inhalation Exposure - The following actions should be taken based on the condition of the effected employee.
♦ If symptoms are present (dizziness, nausea, headache, shortness of breath, burning sensation in mouth, throat, or lungs), the victim should be escorted from the work zone immediately.
* If unconscious, the victim should be removed from the work zone immediately. Rescuers must be wearing proper respiratory and protective equipment before attempting the rescue.
* If the victim is no longer breathing, cardiopulmonary resuscitation (CPR) or some other form of artificial respiration should begin immediately and medical support personnel notified.
Skin Exposure - The skin should be thoroughly washed with copious amounts of soap and water. If clothing is contaminated, it should be removed immediately and the skin washed thoroughly with running water. All contaminated parts of the body, including the hair, should be thoroughly decontaminated. It may be necessary to wash repeatedly.
Ingestion - Medical support should be obtained immediately.
Eyes - If a toxicant should get into the eyes, flush with generous amounts of water. Washing should be continued for at least fifteen minutes and medical attention should be obtained if deemed necessary by the SHSO or Alternate.
PERSONNEL INJURY
The following contingency plan will be enacted in the event of personnel injuries.
1. Initial alarm and first aid. Upon observation of an injury, quickly get attention of other nearby workers. Immediately act to protect the injured person from a life-threatening situation. Render appropriate first aid. Warn unsuspecting persons of the potential hazard. 2. Notify SHSO. Utilizing freon air horn or other rapid method, notify the SHSO or the SHSO representative of the situation. Identify the injured person, the type of injury and the project site location. 3. Ambulance and hospital services. The SHSO or other appropriate personnel will immediately assess the situation and, if necessary, notify the designated ambulance service and hospital of the emergency situation. 4. Follow-up. The Site Safety Officer will determine why the injury occurred and will take appropriate steps to prevent a similar recurrence. Events associated with the injury will be recorded in the project safety logbook.
FIRE/EXPLOSION
Upon notification of a fire or explosion on site, the designated emergency signal shall be sounded and all site personnel assembled at the designated access points. The Fire Department shall be alerted and all personnel moved to a safe distance from the involved area. Personnel in the immediate vicinity of a fire shall use fire extinguishers or other immediately available means if this can be done safety and the fire can be immediately controlled or stopped from spreading, but should not attempt to fight major fires or fires involving potential explosives. The Fire Department will be notified regarding site activities and should respond in case of an emergency.
7 WTC HASP 14
NYC-WTC_000165917
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
12 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164671
Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
15 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
12 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150233
Cover page for a laboratory report regarding landfill operations, dated October 2001.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150209
Laboratory report listing PCM and TEM asbestos air sampling results collected on September 26, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145027
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
8 shared non-person entities · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
11 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
9 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
5 shared non-person entities · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
9 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
9 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Cited alongside this record in an Ask answer