, . , ,»SITE CONTROL
Site workers should minimize contact of personnel and equipment with contaminated or potentially contaminated materials. Access to the site for non-project personnel should be limited by the use of barriers such as tape, fencing, etc. All project personnel shall wear Con Edison issued identification cards.
HEAT/COLD STRESS MONITORING
The SHSO or Alternate shall monitor ambient temperature and implement the following work/rest regimes accordingly:
* For ambient temperatures bettveen 15® and 70®F, standard rest breaks (i.e., fifteen minutes every four hours should be used). (Rest breaks will be taken inside the heated cab of the work and transport vehicles at the discretion of the workers)
* For temperatures below 15°F, work will be done at the discretion of the SHSO or Alternate.
* For temperatures above 70“F, the following regime shall be followed for workers wearing permeable coveralls:
Adjusted Temperature (a) Normal Work Ensemble (b) Impermeable Ensemble
90®F or above after 45 min. of work after 15 min. of work 87.5'’F to 9O’F after 60 min. of work after 30 min. of work 82.5®F to 87.5'’F after 90 min. of work after 60 min. of work 77.5®F to 82.5‘’F after 120 min. of work after 120 min. of work 77.2®F to 77.5®F after 150 min. of work after 120 min. of work
a) Calculate the adjusted air temperature (ta adj) by using this equation: ta adj degrees F = ta ®F -+ 13® x sunshine). Measure air temperature (ta) with a standard mercury-in glass thermometer, with the bulb shielded fi-om radiant heat. Estimate percent sunshine by judging what percent time the sun causes shadows. (100 percent sunshine -no cloud cover and a sharp, distinct shadow; 0 percent sunshine - cloudy, no shadows).
b) A normal work ensemble consists of cotton coveralls or other cotton clothing with long sleeves and pants.
Workers wearing semi-permeable or impenneable encapsulating protective clothing should be monitored when the temperature in the work area is above 70®F. To monitor the worker, measure:
1. Heart Rate - Count the radial pulse during a 30-second period as early as possible in the rest period. If the heart rate exceeds 110 beats per minute at the beginning of the rest period, shorten the next work cycle by one-third. If the heart rate exceeds 110 beats per minute at the next rest period, shorten the following work cycle by one-third. An alternate test is if the heart rate exceeds 140 beats per minute at the end of the work period, and 100 beats per minute at the end of the rest period, shorten the work cycle by one-third or lengthen the rest period by one-third.
2. Oral Temperature - Use a clinical thermometer (3 minutes under the tongue or similar device to measure the oral temperature at the end of the work period (before drinking). If oral temperature exceeds 99.6 F, shorten the next work cycle by one-third. If ora! temperature still exceeds 99.6 ®F at the beginning of the next rest period, shorten the following work cycle by one-third.
Do not permit a worker to wear a semi-permeable or impermeable garment when their temperature exceeds 100.6®F. Workers shall not be required to continue working if they feel any of the symptoms of heart stress. Rest periods should be a minimum of 15 minutes. Length of rest periods should be extended as appropriate or as recommended by the SHSO or Alternate.
7 WTC HASP 13
NYC-WTC_000165916
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
12 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164671
Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
15 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
12 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150233
Cover page for a laboratory report regarding landfill operations, dated October 2001.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150209
Laboratory report listing PCM and TEM asbestos air sampling results collected on September 26, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145027
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
8 shared non-person entities · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
11 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
9 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
5 shared non-person entities · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
9 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
9 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Cited alongside this record in an Ask answer