NYC 9/11 Public Portal Document
was Heat Stress Management Standard Operating Procedure
c. Rest Areas - Rest areas should be air conditioned if possible. The heart rates of workers who
recover in air conditioned areas will be reduced faster and to lower rates than those that recover in
non-air conditioned areas.
d. Manage Work/Rest Schedule - The following woric/rest schedule shall be used as a guideline:
Adjusted Temperature Active Work Time Using Impermeable Protective Gear
75 or less 50 ~
80 ____________________ 40_____________________
85 ____________________ 30_____________________
90 ____________________ 20_____________________
95 ____________________ 10_____________________
100 0
To calculate the adjusted temperature:
T (adjusted) = T (actual) + (13 X fraction sunshine)
Measure the air temperature with a standard thermometer. Estimate the fraction of sunshine by judging what percent
the sun is out: 100% sunshine = no cloud cover = 1.0, 50% sunshine = 50% cloud cover = 0.5, and 0% sunshine =
full cloud cover = 0.0.
Reduce or increase the work cycle according to the guidelines under heart rate and body temperature.
6.0 REFERENCES
• Occupational Safety and Health and Guidance Manual for Hazardous Waste Site Activities
• Patty’s Industrial Hygiene and Toxicology, Fourth Edition
• OSHA Web Site http://www.osha-slc.gov/SLTC/heatstress/index.html
7.0 ATTACHMENTS
None
8.0 RECORD KEEPING
Records which facilitate the tracking of employee fluid consumption and work/ rest cycles will be generated.
9.0 EQUIPMENT
• Oral thermometers and hygienic slip covers or aural thermometers with hygienic slip covers
• Thermometer to measure air temperature
• Cool water and/ or electrolyte containing fluids (e.g., Gatorade)
• Ice cooled vests
• Materials to create shaded work areas
WXS Infrastructure & Environment, /nc
NYC-WTC_000145121
OCR can misread numbers and units. Confirm readings against the page image before using them.