NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/NO INFO
Document / 318 pages

Law Department notice on WTC document preservation, Oct 2001

Machine-extracted title · confidence 95%

Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.

NYC-WTC_000145027–000145344

Folder label: “NO INFO

Page image
Scanned page image, NYC-WTC_000145100
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

11.4 Emergency Equipment/Facilities

• First aid kit • Fire extinguishers • Telephone

The following safety equipment and materials will be maintained on project. Safety Equipment

Number 1 Industrial First Aid Kit 1 Fire Extinguisher per floor 1 Eyewash Station

In the event of an injury requiring more than minor first aid, or any employee reporting any sign or symptom of exposure to hazardous substances, immediately take the victim to a local emergency medical provider. In the event of life-threatening or traumatic injury, implement appropriate first aid and immediately call for emergency medical assistance. If the patient's condition is serious first aid should be administered while awaiting an ambulance or paramedics.

When an individual(s) is being transported to a clinic or hospital for treatment, the Project manager, or IHSO should ensure that information on the chemical(s) the individual(s) have been exposed to at the project is taken. This information, which is included in Section 4.0, could also be given to the hospital during project set-up activities. Any vehicle used to transport contaminated personnel will be treated and cleaned as necessaiy.

11.5 Fire or Explosion

In the event of a fire or explosion, the local Fire Department should be summoned immediately. Upon their arrival, the Project manager or designated alternate will advise the fire commander of the location, nature, and identification of the hazardous materials on project.

The mSO shall act as the designated project emergency coordinator and shall have final authority for initial response to on-project emergency situations. Upon arrival of the appropriate emergency response personnel, the IHSO shall defer all authority but shall remain on the scene to provide assistance, if necessaiy. At the earliest opportunity, the IHSO shall contact the Project manager.

11.6 Spill or Leaks

In the event of a spill or a leak, project personnel will:

• Inform the Project manager inunediately If a leak occurs containment procedures will begin if possible. Simultaneously, the source of the spill will be stopped if it is still releasing material Air monitoring should be conducted downwind. The WRS Representative will be responsible for any reporting procedures that are required as a result of the spill.

-001 WRS Infrastructure and Environment, Inc. 23

NYC-WTC_000145100

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000145100Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000136990

Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0123.

Cited alongside this record in an Ask answer

Compare copies and versions →