NYC 9/11 Public Portal Document
Regulatory Submittal Part III — Health & Safety Plan
Fiterman Hall — 30 West Broadway, New York, New York
Airtek Project 05-0867 — January 10, 2006
Contractor from its responsibilities under OSHA and/or the Specifications.. The Contractor
and Subcontractors shall maintain records of all chemical exposures incurred by their
personnel. These records will be maintained in an up-to-date manner to comply with the
requirements of OSHA. The CSO shall review the results of personal exposure monitoring
to determine compliance with exposure limit requirements.
4.3.2 Emergency Medical Treatment
Emergency first aid should be administered on-site as appropriate. Depending on the
severity of the injury, the patient should be transported to the nearest medical facility, if
needed. Treatment of the injury is of primary concern and decontamination a secondary
concern.
The Field Team Leader will complete the appropriate incident report, if warranted. See
Section 4.4, Accident and Incident Reporting.
An emergency first-aid station will be established and will include a first-aid kit for onsite
emergency first aid.
Provisions for emergency medical treatment shall be integrated with the following
guidelines:
• At least one individual qualified to render first aid and Cardiopulmonary
Resuscitation (CPR) shall be assigned to each shift.
• Emergency first aid stations in the immediate work vicinity,
• Phone numbers and procedures for contacting ambulance services, fire department,
police, and medical facilities shall be conspicuously posted.
• Maps and directions to medical facilities, and evacuation routes and gathering area
locations shall be posted conspicuously around the Site.
4.3.3 Medical Response Equipment
The following medical response equipment shall be available on-site for the duration of the
site activities.
• Eyewash Stations: The location of emergency eyewash stations shall be determined
by the CSO. Each station shall provide a continuous spray of a rate of 0.4 gallons
per minute for at least 15 minutes. This station shall be inspected daily to ensure
proper operation.
• First Aid Kits: The locations of fixed and/or portable kits shall be determined by the
CSO. As a general guideline, each Subcontractor shall provide, at minimum, one
first aid kit for every 20 employees and shall station it within the work area (for
Level D operations) or directly outside the decontamination area (contaminant
reduction zone) (for Level C or Level B)
17
NYC-WTC 000096639
OCR can misread numbers and units. Confirm readings against the page image before using them.