NYC 9/11 Public Portal Document
Regulatory Submittal Part III — Health & Safety Plan
Fiterman Hall — 30 West Broadway, New York, New York
Airtek Project 05-0867 — January 10, 2006
• Automated External Defibrillator (AED): an AED shall be located within the
Contractor's on-site field office.
The locations of these equipment stations shall be determined by the CSO at the site and
incorporated into this HASP upon initiation of each task. The Contractor CSO shall
maintain responsibility for the incorporation of this information into this HASP.
The locations of eyewashes, first aid kits, AED, and the procedures for using and reporting
an incident shall be presented during the initial on-site training. The Contractor CSO shall
make all personnel aware of the locations and use of this equipment prior to engaging in site
work activities.
4.4 ACCIDENT and INCIDENT REPORTING
All accidents, injuries, or incidents will be reported to the CSO. This accident/incident will be
reported as soon as possible to the employee's supervisor. An Accident/Incident Form will be
completed by the Field Team Leader, and a copy will be forwarded to the Project Manager. A copy
of the form is shown as Figure 4.1.
18
NYC-WTC 000096640
OCR can misread numbers and units. Confirm readings against the page image before using them.