12-9-87
The following are responses to BOS’ letter dated 10/29/87 signed by Magdi
Farag, P.E., Chief:
COMMENT
NO. RESPONSE RESOLDTIOS
1. Will comply.
2. Has been done. See Dwg. #C-22.
3. Specification Indicates all existing
facilities impacted by the project to be
replaced. Therefore, all existing splash
blocks (existing) impacted will be replaced.
This will be repeated in the plan.
4. A note stating "all internal manholes
........ shall be maintained by
AMTRAK" will be repeated as Note # 14
on Dwg. S-32.
5. In a meeting on July 2, 1987 with BOS/
Structural Group, it was agreed with Mr. D.
Smith that 15 inch diam. pipe is AMTRAK'S
property and it is existing. The drain
pipe collects general water not directly
connected to bridge above and should not
be changed. 16 inch diam. new pipe is on
the western end of the tunnel and cannot be
connected to 3.5'x3.5' concrete box.
6. Not in direct conflict. It is close.
However, this is a temporary construction
condition. See Note 10 on S.32 and Spec.
7. We will comply.
8. We will include in the Profile on S-32 to
show:
Slope
Type of sewer
Will make reference to Civil Dwg for grading.
Will refer to Dwg S-33 for bedding.