WTC emergency safety plan draft, Sept 2001

Machine-extracted title · confidence 100%

Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.

NYC-WTC_000164671–000164730
Page image
Scanned page image, NYC-WTC_000164720
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

» Worid Trade Center Emergency Project Environmental, Safety, and Health Plan Draft - Revision A 30 September 2001

SECTION 5.0: SITE CONTROL MEASURES

5.1 GENERAL REQUIREMENTS

5.1.1 Medical Facilities

For non-emergency medical needs, contractors to identify specific medical facilities they will use and establish required protocols directly with the facility

5.1.2 First-Aid Stations

Contractors shall ensure all employees are aware of the availability and location of First Aid Stations as part of initial site orientation and training. Current locations of First Aid Stations shall be clearly shown on site maps to be posted on informational bulletin boards on site.

5.1.3 Emergency Eyewash Stations

Portable eyewash stations will be provided and maintained around the WTC Work Zones. These stations shall have the capability of providing a continuous flow of eyewash water for a minimum of 15-minutes and be properly winterized to ensure they are functional during freezing weather. Eyewash stations will be maintained and include documented inspections in accordance with the manufacturer’s recommendations.

5.1.4 Site Communication Methods

All contractors shall ensure employees are aware of the current waming/notification system for both emergency and non-emergency situations as part of initial site orientation and t raining. Current warning signals shall be posted on informational bulletin boards on site.

A roster of key personnel contact names and numbers shall be established and maintained for emergency and non-emergency situations. All contractors shall, as a minimum, have a two-way communication system with their field supervision and safety and health personnel.

5.2 PRE-ENTRY BRIEFING

All contractor personnel are to attend a comprehensive orientation training program conducted by contractor ES&H personnel in accordance with Section 1 prior to being allowed site access. Contractors will maintain records of employees who have attended the orientation. Employees will be provided with documentation that they have attended the orientation.

50

NYC-WTC_000164720

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000164720Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →