WTC emergency safety plan draft, Sept 2001

Machine-extracted title · confidence 100%

Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.

NYC-WTC_000164671–000164730
Page image
Scanned page image, NYC-WTC_000164695
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

World Trade Center Emergency Project Environmental, Safety, and Health Plan Draft - Revision A 30 September 2001

SECTION 2.0: HAZARD INFORMATION & RISK ASSESSMENT

2.1 HAZARD IDENTIFICATION SUMMARY

Based upon the known work activities required for the WTC Emergency Project, there may be a potential for exposure to a number of hazardous conditions during the performance of the specific work. These conditions, and their potential causes, are summarized in Table 5 below.

Since these hazards are identified and addressed through the JHA process for each task, personnel involved in WTC work activities shall review and understand the applicable JHA(s) before beginning work on any WTC Activities.

Table 5: Potential Hazard/Injury Categories for WTC Emergency Project Hazard/Hazardous Condition Potential Cause(s) Struck by Moving vehicles, equipment, falling parts/debris/materials Caught in, on, or between Pinch points, sharp points; moving equipment, use of tools, trench Contact with hazardous debris, materials or Physical (eyes, skin, etc.); Biological (pathogens, bites, stings, etc.) substances Contact with hazardous energy Electrical, thermal, noise (equipment operations), vibration (jack hammer) Fall to same level Slip/trip on uneven/slippery surfaces; poor lighting (in damaged buildings)_______________________________________________________________ Fall to different level Working at heights from elevated structures (ladders, lifts, roofs, etc.) Inhalation/Absorption Smoke, chemical (PCB, lead, mercury, asbestos) Strains and Sprains Over-reaching, over-exertion, manual lifting Psychological Stress Disaster casualties

2.2 JOB HAZARD ANALYSIS (JHA)

2,2.1 General The primary tool used to identify and mitigate hazards associated with individual field activities for WTC work are the Job Hazard Analyses (JHAs). These documents specifically describe the hazards associated with the work, and the mitigation measures required to either eliminate or control p ersonnel e xposure to these hazards. Therefore, while this ES&H Plan provides the general and programmatic safety information required for the WTC Emergency Project, information regarding job/task specific hazards will be found in the JHA(s).

2.2.2 JHA Preparation: Each contractor shall prepare JHAs in accordance with the requirements outlined in their individual ES&H Plans for their organization. The JHA is typically developed and prepared by a Team of personnel.

25

NYC-WTC_000164695

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000164695Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →