ES&H
WTC Evaluation
An overall site environmental S&H assessment was conducted on September 28,2001 of the WTC disaster
a-ea. The primary focus was to identify any major unsafe practices or unsafe conditions that pose a threat
to search and rescue personnel, cleanup workers, and support personnel on site.
Major Concerns and proposed corrective actions are listed below;
1.
• Concern' Subcontractor to Turner cleaning American Stock Exchange building was throwing bags
t' and debris down 5/6 floors to the street Bags were bursting and scattering debris tlirougtout the
street, no barricades, or proper disposal of debris.
Recommended Correction Action; Shut down contracic r - contacted Turner to handle. Turner
i! immediately corrected probieni.
!
• Concern: Lack of use of fall protection in man basket when working over rubble pile - Tully I
!|
Recommended Correction Action; Notified Tully to deie.mine if indi'. iduals were FDNY or craft
ii
Tull; still researching.
o Concern; Individuals riding tn bucket and backhoe, while full of gas bottles
Re.,f.ntniend<d Correction .Action: All contractors will be notified to elimiiate this practice
• Cnncvrn; PS’*® non-compliance w ith eye protection, and 30’.i non-compliance for individuals
!, '' king on or near pile.
Kveummended Correction .Action: Continue to push for tompliance with coniractcrr and Agencies
« Concern; Equipment, gaters, cars, trucks, etc speeding throughout the site.
Re< xi,intended Correction .Action: Recommend that we establish, a 5 m.p h. speed limit througi-.-.m
l!.e , tc
» t ii,i .rrii. Indi’, iduals burning and cutting without eye protection
R-c amended Correction Action; Contractors should direct al! individuals to wear apptcj. ' it.. >- ,
pl irction while performing ta.sk that could cause eye injury
CorKern: Exposed open holes not properly barricaded
Recc'juiiended Correction Actioti; Contractors should properly barricade all open holes uhrre
! ndividuals or equipment could fall
• Concern: Equipment backing up without spotters
Recommended Correction .Action: All equipment either mo. lag forward into positka o;
cut 'f position should have proper spotters to clear the path for the vehicle or equipment
5 • Concern: Swing radius of cranes not properly barricaded
Recommended Correction Action: Contractors should ensure that all crane swing radiuse.' are
s •
properly barricaded
Concern: Individuals placing themselves in traffic patterns narrowly missing being injured
J Recommended Correction Action; Walking paths should be established to prevent individual from
walking in the paths of the dump truck lane
i •' rr