NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/No folder label
Document / 60 pages

WTC emergency safety plan draft, Sept 2001

Machine-extracted title · confidence 100%

Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.

NYC-WTC_000164671–000164730
Page image
Scanned page image, NYC-WTC_000164691
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

World Trade Center Emergency Project Environmental, Safety, and Health Plan Draft - Revision A 30 September 2001

In addition to immediate verbal (oral) reporting of all incidents to the DDC/Site ES&H officer, for serious incidents, the Contractor shall immediately notify the WTC Emergency Project ES&H Director. A “serious” incident includes the following: • Imminent danger safety violations • Any incident involving the general public or visitors • Discovery of potential ordnance or projectiles • Exposure to a hazardous substance above the allowable exposure limit • Work-related injury requiring more than First Aid • Work-related illness • Spills of hazardous material in excess of 1 gallon or the Reportable Quantity, including unknown or potentially hazardous soils, debris, and containers discovered on roadways. The reportable quantity for petroleum products is 25 gallons. • Potential environmental violation • Any cylinder discovered with unknown contents must be reported to the EPA (646-756- 3136) • Any unexpected contact or damage to aboveground or below ground utilities • Other unusual incidents of a serious nature

1.6.5 Incident Reports

Contractors will prepare a written incident report for all incidents as described in Section 1.6.1 during the work shift when the incident occurred. The report is to be prepared by the supervisor responsible for the Contractor activity/area where the incident occurred.

1.6.6 Incident Investigations

An incident investigation shall be performed for all incidents for which a report is required. The contractor supervisor and the ES&H manager shall perform the investigation and shall include participation by others as necessary. The investigation is to be initiated as soon as possible after the incident.

1.6.7 Investigation Follow-Up

Contractors shall establish a follow-up system for all investigation findings under their control. The system shall identify the corrective action(s) to be taken, the individual responsible for each corrective action, and the date the corrective action was implemented or verified.

1.6.8 Lessons Learned

The WTC Emergency Project will develop lessons learned reports for incidents for site wide distribution as appropriate.

21

NYC-WTC_000164691

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000164691Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →