NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
15 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
NYC-WTC_000164671–000164730
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
World Trade Center Emergency Project Environmental, Safety, and Health Plan Draft - Revision A 30 September 2001
Table 4b: Modified Wet Bulb Globe Temperature Values - Moderate Work Load Reflects Heat Exposure Threshold Limit Values in “C and “F (WBGT) Summer Coveralls or Coveralls or Rain Coveralls or Moderate Work Tyvek® Tyvek® Work Rain Suit No Suit w/PAPR or Rain Suit w/Full Load* No Respirator w/any Respirator Uniform Respirators Half Mask Face Respirator Clothing Correction 0 -2 -4 -6 -6 -10 FC) Continuous Work, <26.700 <24.7“C <22.7°C <20.700 <20.70C <16.70c (15 mn. rest every 2 hrs) <80.0OF <76.5OF <72.9OF <69.3OF <69.3OF <62.1 OF
75% Work/25% Rest, 26.8-28.0°C 24.8-26.0oC 22.8-24.0‘’C 20.8-22.0°C 20.8-22.0“C 16.8-18.00c (Each Hour) 80.1-82.0°F 76.6-78.2OF 73.0-75.2<’F 69.4-71.60F 69.4-71.6°F 62.2-64.4OF
50% Work/50% Rest, 28.1-29.4‘>C 26.1-27.400 24.l-25.40C 22.1-23.40c 22.1-23.40c 18.1-19.40c (Each Hour) 82.1-85.0‘’F 78.2-81.3°F 75.3-77.70F 71.7-74.1OF 71.7-74.1 OF 64.5-66.90F
25% Work/75% Rest, 29.5-31.1°C 27.5-29.10C 25.5-27.1‘’C 23.5-25. rC 23.5-25.100 19.5-21.1°C (Each Hour) 85.1-88.0OF 81.4-84.40F 77.8-80.8°F 74.2-77.2°F 74.2-77.2°F 67.0-70.0OF
*Moderate Work Load: Wa/king about with moderate lifting and pushing, carrying materials (200-350 kcal/hr)
1.4.2.3 Noise:
Exposure to high noise levels is a potential hazard associated with the operation of heavy equipment, power tools, generators, compressors, pumps and similar activities that may be performed by the contractors. Exposure to intermittent high noise levels exceeding accepted standards may result in hearing loss.
Whenever noise levels are measured or anticipated to exceed a time-weighted average (TWA) of 85 decibels as measured on the A scale (dBA), worker protection against the effects of noise exposure shall be provided in accordance with 29 CFR 1910.95 or 29 CFR 1926.52 as appropriate. Administrative or engineering controls shall be provided where feasible. If such controls fail to reduce exposure to below 85 dBA TWA, appropriate hearing protection shall be provided and the work area or equipment shall be posted with warning signs to alert workers to the requirement for hearing protection use.
For high noise activities (greater than a TWA of 85 dBA), a written hearing conservation program meeting the requirements of 29 CFR 1910.95 is required and shall be implemented for affected personnel.
1.4.2.4 Manual Lifting:
There will be numerous opportunities for personnel working at the WTC Emergency Project to handle/lift and move objects and structures of varying weights and sizes. Proper lifting techniques shall always be used when manual lifting is required. Personnel shall always seek assistance and/or use material handing equipment/devices when a load is determined to be too heavy or large to be safely lifted alone. Proper lifting techniques will be provided in the JHA for the task.
17
NYC-WTC_000164687
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
15 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
24 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
17 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000142247
Generic DEP form from Box 06 with illegible content regarding environmental services.
11 shared non-person entities · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
24 shared non-person entities · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
33 shared non-person entities · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149199
Department of Environmental Protection advisory letter dated October 25, 2001, addressed to residents of Lower Manhattan.
18 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145345
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
33 shared non-person entities · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
13 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
15 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
15 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153096
Interagency memo circulating EPA revisions for NESHAP and related programs with request for legal and agency comments.
14 shared non-person entities · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000124224
Letter from Brookfield requesting approval to open 1 Liberty Plaza for occupancy on October 22, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000141585
Map showing the condition of buildings at the World Trade Center site as of September 21, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000145027
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer