NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 02/30 West Broadway
Document / 53 pages

Permit application Part III, health Jan 2006

Machine-extracted title · confidence 90%

Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.

NYC-WTC_000095781–000095833

Folder label: “30 West Broadway

Page image
Scanned page image, NYC-WTC_000095795
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Regulatory Submittal Part III — Health & Safety Plan Fiterman Hall — 30 West Broadway, New York, New York Airtek Project 05-0867 — January 10, 2006

4.2.4 Noise Hazards

Operation of equipment may present a noise hazard to workers. Site personnel will utilize hearing protection when noise levels are determined to be in excess of 29 CFR 1910.95 requirements. Noise monitoring will be performed to determine noise levels.

4.2.5 Overt Chemical Exposure

Typical response procedures include:

SKIN CONTACT: Use copious amounts of soap and water. Wash/rinse affected area thoroughly, then provide appropriate medical attention if symptoms warrant. Eye wash shall be provided on-site at the work zone and support zone as appropriate. If affected, eyes should be continuously flushed for a minimum of 15 minutes.

INHALATION: Move to fresh air and transport to hospital if symptoms warrant. Decontaminate as other actions permit.

INGESTION: Transport to emergency medical facility if symptoms warrant. Decontaminate as permitted by other requirements.

PUNCTURE WOUND OR LACERATIONS: Transport to emergency medical facility if symptoms warrant. Field Team Leader will provide Material Safety Data Sheets (MSDS) to medical personnel as requested. Decontaminate as permitted by other requirements.

4.2.6 Adverse Weather Conditions

In the event of adverse weather conditions, the Field Team Leader will determine if work can continue without endangering the health and safety of field workers. Some items to be considered before determining if work should continue are:

Potential for heat stress and heat-related injuries. Potential for cold stress and cold-related injuries. Treacherous weather-related working conditions. Limited visibility. Potential for electrical storms or high winds.

4.2.7 Biological Hazards

Biological concerns in the work area are primarily, insects, rodents, and mold/fungi.

4.2.7.1 Insects

lR

NYC-WTC 000095795

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000095795Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Cited alongside this record in an Ask answer

Compare copies and versions →