7. The Pifyect Monitor shall schedule and overseefccleaningoperationsofthe Cleaning Contractor.
No residential, common space orHVACsystan shall be cleaned until the exterior ofthe building
has been cleaned or approved by EPA. If a scheduling problem arises the Project Monitor should
contact EPA. The Project Monitor shall coordinate daily access for cleaning and sampling with
residents, owners, the Cleaning Contractor and sampling technicians.
8. The Monitoring C'ontractor shall provide sufficient personnel to provide periodic (3-4hours/unit)
oversight ofthe Cleaning Contractor to verify that wack is being conU iic led in accordance with the
Cleaning Contact Scope of Work,
9. rhe Project Monitor shall verify that the Cleaning Contractor is using pritperly trained and certified
NYSDOL and N'YCDEP certified workers.
10. The Project Monitor shall conduct routine quality assurance inspections during the couree ofcleaning
and concur by initialing the Cleaning Checklist (to he de\ elcsped) for tasks completed satisfactorily.
Deliverables
The Project Monitor shall review all deliverables prior to submission to EPA. The review shall
assurethat each deliverable is accurate and complete, technically sound, and free ofclerical errors.
The Project Monitor shall submit the completed Cleaning Checklist via F2L or an agreed upon
alternative electronic format or website approved by KPA within 24 hours of activity.
11. Personal Air Monitoring '
■ Personal air monilormg shall be performed by the Monitoring Contractor in accordance with
USDOLOSHA requirements. The person who conducts sampling shall possess a valid NYS DOL
certificate. Personal air monitoring will be pertbnned on aminimum ofone worker per shift per
■ apartment during for the first 6 weeks of cleaning operations. This may be extended based on a
determination made by EPA, DEP and OSllA. Thereafter personal, air monitoring samples will be
taken at one sample per quadrant per day. AU samples shalTbe colleeted and analyzed in
accordance with NIOSH 7400 Method for PCM and 7402 for TEM. Analysis ofthese samples
shall be the responsibility ofthe Monitoring Contractor. Resate of analysis sBall proviBedfo
EPA by the laboratory in aO; approved electronic format within 24 hoars of coUeetion,
Copies of the results shall also be sent immediately to DEP, OSHA and the employer. The
employer will make these results availaWe to the employees or their designated
representatives for their review In, ■'accordance with-29 GER19T0.1001 -nnd 29 GFR
1926.58. ■ ;
The/Cotttractorsliall;dQcnnieatM'theaecessaryittforinattettregaraingsanipling:activtties,
fill but ill field togs, data sheets, and chain-tof’Ciistedy forms. TBecontraetor sliaBrise F2L
for all sample and cfcaiiifol^cBstoiy docttmeiitatioft. This data sial be provided to-KPA
within 24 hours of comptettotttof tie sampling.-