7. The Project Monitor shall schedule and oversee the cleaning operations of the Cleaning
Contractor. No residential, common space or HVAC system shall be cleaned until the exterior
of the building has been cleaned or approved by EPA . If a scheduling problem arises the
Project Monitor should contact EPA. The Project Monitor shall coordinate daily access for
cleaning and sampling with residents, owners, the Cleaning Contractor and sampling
technicians.
s. The Monitoring Contractor shall provide sufficient j persoi lb ifovide periodic (3-
4hours/unit) oversight of the Cleaning Contractor to verify th $ being conducted in
accordance with the Cleaning Contact Scope of Work
The Project Monitor shall verify that the Cleaning Contractor is using propC and
certified NYSDOL and NYCDEP certified workers.
.0. The Project Monitor shall conduct routine quality assurar sections during the course of
cleaning and concur by initialing the Cleaning Clw&ist (B llloped) for tasks completed
satisfactorily.
i
Deliverables
The Project Monitor shall review all deliver! blCs pnorto submission to EPA. The review shall
assure that each deliverable is accurate a^ domplete^ltechnically sound, and free of clerical
errors.
JI'
The Project Monitor shall submit ^^Keaning Checklist via F2L or an agreed upon
alternative electronic format or webstte a foved by EPA within 24 hours of activity.
1. Personal Air Monitoring
♦
Personal monitoring shall be performed by the Monitoring Contractor in accordance with
USDOL QSHA requirements. The person who conducts sampling shall possess a valid NYS
DOL certificate. Personal air rtionitoring will be performed on a minimum of one worker per
per apartment during for the first 6 weeks of cleaning operations. This may be extended
based on a determination made by EPA, DEP and OSHA. Thereafter personal air monitoring
samples will be ta^n ai one sample per quadrant per day. All samples shall be collected and
analyzed in accordance with NIOSH 7400 Method for PCM and 7402 for TEM. Analysis of
these samples shall be the responsibility of the Monitoring Contractor. Results of analysis
shall provided to EPA by the laboratory in an approved electronic format within 24
f^llection. Copies of the results shall also be sent immediately to DEP, OSHA
ie employer. The employer will make these results available to the employees or
their designate representatives for their review in accordance with 29 CFR1910.1001
and 29 CFR 1926.58.
The contractor shall document all the necessary information regarding sampling
activities, fill out all field logs, data sheets, and chain-of-custody forms. The contractor
NYC-WTC_000139554