NYC 9/11 Public Portal Document
g- Wooden floors will be damp mopped or H EP A vacuumed (if unfinished) in consultation
with resident v ; . ' ' v
h. Plants sKalTbe cleaned by rinsingieaves with water. ■ - ri -
i. Paperwork, books shall be HEPAvaeuuined. ■ a
j- Electrical outlets, baseboard heatiag elements will be vacuumed. ■
k. Window air conditioners will be vacuumed then removed from ihcir position and vacuumed
internally. Filters will be HEPA vacuumed and reinstalled. Air conditioners will be
reinstalled after cleaning.
1. IntakeZdischargeregisters ofHVAC systems (it*present) will be remowd/eleaned. The first
foot of duct work will also be vacuumed, then the register will be reinstal led and covered
with plastic. ■
m. Appliances such as refrigerators and stoves will be cleaned and moved. The floor footprint
ofthe appliances will be deaoedandtte^appliance will be reinstalled in its original position.
n. Refrigerator cooling tubes will be brushed and vacuumed. '
o. Stove storage drawers will be vacuumed if present. Stove cook tops will be opened and
vacuunaed. Stove exhaust fan filters will be cleaned .
P- The first foot ofall exhaust duct work (including stove, diver and bat broom vents) will be
vacuumed. Exhaust fans will be vacuumed and wiped.
q- Closet interiors will be vacuumed. 2 ■
r. Solid objects (electrical equipment, exerc ise eq ui pment. etc.) will be Wet wiped, moved to
allow cleaning of the underlying surface and will be returned to their originaldocation.
s, Dishwashers toe plates will be removed and the floor beneath the appliance will be cleaned.
t. Protective covers on finned radiant heaters and baseboard heaters will be removed to
expose heat elements. Fins are IO be brushed and vacuumed to remove dust.
u. All cleaning equipment will be wicuumed and/or wet wiped for use on the residence.
4, I lEPA air filtration devices (AFDs) will run continuously during all cleaning activities as appropriate
given site conditions.. A standard i 201) cfm device shall be installed per 3-6,000 cubic feet.
5. An adequate number ol'asbestos superxisors shall be present at each work place (work place is
defined in'f’itle /?. (.'hapter i RCNY as the work area and the ctecontarninatidnenclosure system).
6. A cleaning checklist (to be developed) willbe completed by the supervisor at the completion ofthe
cleaning. T ■ y
7. A thorough visual inspection will be conducted by the Project Monitor to verify the absence ofvisible
dust accumulations. Additional clean-up procedures shall be perfonned where visible dust is
observed.
8. Air sampling shall be performed by the Air Sampling Technician after ^the area is free of dust
accuninlations as determinedbythefrfpject Monitor. Ifthe apartment does not meet the cleanup
criteria of 0.0009 fibers/cc (TEM) the apartment will be recleaoed aad^retested.