i. Paperwoik, books shall be HEPA vacuumed.
j- Electrical outlets, baseboard heating elements will be vacuumed.
k. Window air conditioners will he vacuumed then removed from their position and
x'acuumed internally. Filters will be HEPA vacuum^ and reinstalW. Airconditioner
will be reinstalled after cleaning.
1. Intake/'discharge registers of HVAC systems (if present) will be removed/cleaned. The
first foot of ^ct work will also be vacuumed, then the register will be reinstalled and
covered with plastic.
m. Appliances t^ch as refrigerators and stoves wil|be cleaned arid rhoved. The floor
footprint of Be appliances will be cleaned and the appliance will be reinstalled in ite
original posifion. , Z
n. Refrigerator imoling tubes will be brushed and vacuumed '
o. Stove storage drawers will be vacuumed if present. St(^ cook tops and
vacuumed. Stove exhaust fan filters will be cleaned .
P- The first foot jf all ©dia'.’st duct work (including stove, dryer and bathroom vents) will
be vacuumoB Exhaust fans will be vacuumed and wiped.
q- Closet interiors will be vacuumed.
r. Solid objects {electrical equipment, exercise equipmeint, etci) will be wet wiped,
moved to alldw cleaning of the underlying surface and wi11 befetumed to their original
location. 1
s. Dishwasheriftoe plates will be removi ,eneath the appliance will be
cleaned.
t. Protective covers on iant heaters and baseboard heaters will be removed to
expose heat elements. Fins are to be brushed land vacuumed to remove dust.
u. All cleaning equipment will be yacuum^^rd/or wet wiped for use on the residence.
<
8. HEPA air filtration devi ^AFDs) will run continuously during all cleaning activities (as
appropriate given site wi iitipns.. A standard 1200 cfin device shall be installed per 36,000
'I • T • ■
cubic reet.
9. An adequatenum 3f asbestossupervisors shall be present at each work place (work place
is defined in Tith ChaptCT I RCNY as the work area and the decontamination enclosure
■ ' '
sXifc)-
10. dealing checkliMto be developed) will be completed by the supervisor at the completion
; of the cleaning.
i ij ■ ■
11 |’'^'“'A’Borough visual inspection will be conducted by the Project Monitor to verify the absence
of visible dust accumulations. Additional clean-up procures shall be performed where
^^fesibleflust is observed.
12. Air sampling shall be performed by the Air Sampling Technician after tire area is free of dust
accumulations as detennined by the Prefect Monitor. If the apartment does not meet the
cleanup criteria of fibers/cc (TEM) the apartment will be recleaned and retested.