q- Dishwashers toe plates will be removed and the floor beneath the appliance Will be cleaned.
r. Protective covers on finned radiant heaters and baseboard heaters will be removed to
expose heat elements. Fins are to be brushedvacuumed to remove dust.
s. All cleaning equipment will be vacuumed and/or wet wiped for use on the residence.
3. HEPA air filtration devices (AFDs) will run continuously during all cleaning activities as appropriate
given site conditions; A minimum ofone airchange every 30-minutes shall be provided. A standard
1200 cfm device shall be installed per 36,000 cubic feet.
4. An adequate number of asbestos supervisors shall be present at each • ■ ■ .J- pr ■■cork place is
defined in Title 7d, Chapter 1RCNY as the work area and the decontaminai i c: • -ik-i. v.ure system).
5. A cteaning checklist (to be developed) will be completed by the supervisor al the completion ofthe
cleaning. ■ ■ ■ ■
6. Athorough visual inspection will be conducted by the Projeci Monitor to verify the absence ofvisible
dust accumulations. Additional clean-up procedures shall be performed where visible dust is
observed.
7. Air sampling shall be performed by the Air Sampling feehnician after the area is free of dust
accumulations as determined by the Project Monitor. Ifthe apartment does not meet the 30 year 10-
04 risk hased clean up criteria the apartment will be recleaned and retested.
8. Anydattiage or loss to that occurs during cleaning is the responsibility ofthe cleaning contractor.
The cleaning contractor is not responsible for damage or loss caused by the acts of parties not
involved in the cleanup.
9. All waste generated shall be treated as asbestos containing material. Transportation and disposal of
generated waste shall be in compliance with all applicable rules and regulations.