LABORATORIES, INC
AIR SAMPLE ANALYSIS REPORT
PHASE CONTRAST MICROSCOPY
CLIENT; WARREN & PANZER ENGINEERS, P.C. TURNAROUND TIME 24HRS
WKP FILE# 501-01 S/1tt002
SAMPLE DATE
WKP LOG I D. # N020S02, N020S03. and N020504
RECEIVED DATE s;i4ic»2
Contract #; WTCAR2 9/2/2902
/LNALVSI8 DATE
REPORT DATE 5/2/2002
CLIENT JOB: NYC Department of Environmental Protection
CLIENT JOB#; 1079.01.01
LOCATION S.W, Area/Site Map
ANALYSIS; AIRBORNE FIBER COUNTING, PHASE CONTRAST MICROSCOPY, NIOSH 7400. NIOSH PAT Lab NO. 07186; NY
COLLECTION DEVICE 25 mm MCE Filter Cassette; Collection Area = 385 sq mm;
SAMPLE WERE COLLECTED BY; Pesty Osemwegie. J. Garcia, and Banny Giambnone .
SUMMARY OF ANALYSIS
CLIENT FIBERS/ FIBERS/
SAMPLE# Site# SAMPLE LOCATION Vol. sq mm cc
1079.01.01 001 27 Gateway Piaza Park Area 875 1.30 <0.004
002 31 South End A’/e. and Albany Street 676 1.30 <0.004
003 32 West Street arte Albany Place 875 3.20 <0.004
004 33A Rector Place by the Park Place 675 0.00 <0.004
005 34 W. Thames Street • Along Waterfront 675 2.50 <0.004
006 37 West of Thiid Place 675 1.30 <0.004
007 8 West Streel and Warren Street . 675 1.30 <0.004
006 4 River Terrace arte Chambers Street 675 0.00 <0.004
009 6A River Terrace Park Area Between Park Place and Warren Street 675 1.30 <0.004
010 S River Terrace and Park Piace West . 675 1.30 <0.004
011 17 River Terrace and Vesey. 675 0.00 <0,004
012 7 Warren Street and North End Avenue 675 0.00 <0.004
013 10 North End Avenue Park place West 675 0.00 <0,004
014 29 Trinity Place and Thames Street 675 0.00 <0.004
01S 21 Fulton and Church Street 675 0.00 <0,004
016 20A Vesey Street and West Broadway 675 0.00 <0,004
017 16 Park place and Church Street 675 0.00 <0,004
018 12 Mun'ay Street and Church Street 675 0.00 <0.004
019 15 Park Place and Greenwich Street 675 0.00 <0.004
020 11 Murray Street and Greenwich Street 675 0.00 <0.004
021 Field Blank 0.00
022 Field Blank 0.00
NOTES; 1. 5.5 fibers/100 fields was used to calculate the limit of detection (LOO).
2. Samples were net collected by WKP Laboratories,.Inc,
3. The Federal ERA Clearance Critical following an asbestos abatement project is 0.010 fibers/cc.
4. PCM air samples will be disposed of after 3 months unless otherwise directed by client in writing.
LDuiS Lombardi
LABORATORY ANALYST LABORATORY DIRECTOR
NYC-WTC_000161805