I.

Gilsenan, Michael From: Sent: Thursday, February 13, 200311:43 AM To: Michael Gilsenan Subject: FW: Revised DEP scope

--Original Message----- [mailto:[email protected]] From: Christopher Warnick February 12, 2003 9:01 AM

Subject: Re: Revised DEP scope P11 specs. Please find the following responses to the DEP

Denise, please verify insurance; Contractors General Contractors to provide $10,000.00 Asbestos Abatement Condominium and 114 Liberty Street Liability Insurance coverage listing include property additionally insured. Coverage should Arnold S. Warwick as Unit Owner consider individual damage coverage. You may also want to coverage by the contractor in case of an accident. Statutory Disability and Worker's One million dollar automobile liability, Compensation Coverage to be provided by Contractor.

The following general notes should be added. securing the construction areas a. The Contractor shall be responsible for until the completion of the contract. neatly, in a systematic manner. b. All Work shall be performed carefully and be maintained and kept free c. Existing plumbing lines and drains are to from blockages to prevent any flooding. framing, conduit, wiring, d. After removing drywall surfaces, all metal from any physical damage. piping and cabling shall be protected equipment to remain shall be fully e. All existing surfaces, appliances and protected from damage. The contractor shall assume responsibility for damage additional cost to the Owner(s). and shall make repairs required without the site. Debris shall be f. No debris shall be allowed to accumulate on contractor as the job proceeds. Debris removal regularly removed by the strict accordance with applicable regulations. shall be in ;nd;^ated to be_saved_-for g. The Contractor shall carefully protect item3 re-use.

Responses to DEP Spec items: converted to "house power" for the #5. All Unit electrical panels will be duration of this work. DEP to provide specific loads requirements ASAP. use during the cleaning phase. DEP Exiting water tank will be santitzed for 1

NYC-WTC 000155450

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000155450Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →