firm shall be submitted directly to the DEP
An ACPT form signed by the contractor and sir-monitoring the NYS DOL. The size of the project,
representative on site. The DEP shall provide notification toowners shall provide written authorization
specified area,shall be indicated on *the AC?? form.. Building
to the DEP the work activities.
for
other city agencies.
DEP will coordinate activities with building owners and
specified by the DEP.
The sites and specific areas to be cleaned shall be determined and
activities. Caution
The contractor restrict access by the public to the work area(s)during clean-upto the contractor,his
Access shall be limited
shall
tape and warning signs shall be used to identify work areas.
employees,and Federal, State or local officials.
bag,transport, and dispose collected
The contractor shall provide all necessary equipment,to remove,equipment.
waste. The contractor is responsible for supplying all necessary
DEP shall consider substitution of
The specific cleanup procedures for building roofs are attached. The Any substitutions mustreceive
the specified methodologies only ifthe request is received in writing.
prior approval by the DEP:
For large asbestos clean-up projects,a partial dccontaminatiou system(changing room and shower)shall
dacontarainetion system shall be acceptable
be required at an entry/exit from each work area. A remote
with DEP on-site approval.
ctol'
Oqidifleatlons
sufficient number ofproperly trained and
The contractor shall have on staff and assigned to the contract a
certified workers. See above.