directly to the DEP
;_ An ACP7 form signed by the contractor and air-monitoring firm shall be submitted the project,
representative on site. The DF.'shall provide notification to the NYS DOL. The size ofauthorization
specified area,shall be indicated on the ACP7 form.. Building owners shall provide written
to the DEP for the work activities.
DEP will coordinate activities with building owners and other City agencies.
The sites and specific areas to be cleaned shall be determined and specified by the DEP.
Caution
The contractor shall restrict access by the public to the work area(s)during clean-up activities.
tape and warning signs shall be used to identify work somas. Access shall be limited to the contractor,his
employees,and Federal, State or local officials.
The contractor shall provide all necessary equipment,to removes bag,transport, and dispose collected
waste. The contractor is responsible for supplying all necessary equipment.
The specific clean-up procedures for building roofs are attached. The DEP shall consider substitution of
the spewed methodologies only ifthe request is received in writing. Any substitutions mustreceive
prior approval by the DPP.
For large asbestos clean-up projects,a partial decontamination system(changing room and shower)shall
be inquired at an entry/exit from each work area. A remote decontamination system shall be acceptable
with DEP on-sate approval.
Contractor Quell ca . 0n
The contractor shall have on staffand assigned to the contract a sufficient number ofproperly trained and
certified workers. See above.