SEP-11-2002 11:32 NYCDEP BANHM ASB/LEAD TRU 718 595 3648 P.09
monitoring fine shall be submitted directly to the DEP
An ACP7 form signed by the contractor and airnotification to the NYS DOL. The size of the project,
representative on site. The DEP shall provide
Building owners shall provide written authorization
specified area, shall be indicated on the ACP7 forth..
to the DEP for the work activities.
other city agencies.
DEP will coordinate activities with building owners and
and specified by the DEP.
The sites and specific areas to be cleaned shall be determined
area (s) during clean-up activities. Caution
The contractor shall restrict access by the public to the work
Access shall be limited to the contractor, his
tape and warning signs shall be used to identify work areas.
employees, and Federal, State or local officials.
bag, transport, and dispose collected
The contractor shall provide all necessary equipment, to remove,equipment.
waste. The contractor is responsible for supplying all necessary
attached. The DEP shall consider substitution of
The specific clean-up procedures for building roofs are
writing. Any substitutions must receive
the specified methodologies only if the request is received in
prior approval by the DEP.
system (changing room and shower) shall
For large asbestos clean-up projects, a partial decontamination
decontamination system shall be acceptable
be required at an entry/exit from each work area. A remote
with DEP on-site approval.
Contractor Qualifications
sufficient number of properly trained and
The contractor shall have on staff and assigned to the contract a
certified workers. See above.