Roof Clean.UQ
protocol for cleaning roofs contaminated
Application: This procedure utilizes wet methods and. careful hygiene
with asbestos containing material (ACM).
entry/access determinations. All abatement will be
1. The entire roof shall be considered the work area forDEP certified workers.
performed by NYSDOL licensed contractors with NYC
accumulations of visible debris, the clean-up areas shall be
For non-gravel or stone covered roofs with localized
specified ("specified area") by DEP.
specified roof area for clean-up.
For gravel/stone covered roof surfaces, the entire roof shall be included in thewashed. Water shall be collected,
The gravelistone shall be taken to a clean-up staging area on the roof and
filtered, and discharged into the drain/sewer as applicable.
located on the roof immediately adjoining the roof
2. A changing area consisting of two adjacent step-off pads clean pad shall be adjacent to the
entrance/exit. This area shall consist of a clean pad and a change pad. The
exterior access). The change pad shall be
building interior access way (or at the point of entry to the roof for
shall consist of two layers of 10-
adjacent to the contaminated roof areas. Each pad (change pad and clean pad)
enough to facilitate changing and
mil reinforced plastic on the roof/access way surface and shall be large the exact configuration will
decontamination as described herein. A minimum of 4' x 4' is recommend, though
be specific to the roof.
point of entry to the roof) directly onto the
3. Workers shall first step from the building interior (or exterior at the
disposable coveralls, plastic booties,
clean pad. On the clean pad, each worker shall be double suited with
gloves, and head coverings. Rubber boots may be used instead of the plastic booties. The boots shall be wet
minimum of a half-face air-
wiped and HEPA vacuumed prior to leaving the roof. Each worker shall wear a
purifying respirator equipped with HEPA cartridges.
in the clean-up shall be cleaned by
4. All penetrations at the roof within 10 feet of the specified roof area included
wet methods/HEPA vacuum and sealed with 6-mil polyethylene sheeting.
the entrance/exit.
Roof cleanup shall begin at the entrance/exit and proceed in a path working away from
release.
Water shall be the primary engineering control to minimize the potential for fiber
techniques with water, mops, rags,
6. Roof surfaces shall be wetted and then wet cleaned using wet wiping cleaning.
brushes, etc. HEPA vacuuming may also be used as alternative to or in combination with wet
shall observe the personal
7. Throughout the procedure, all personnel entering or existing the roof walking on or disturbance of
decontamination practices. Attention shall be paid to limiting unnecessary
strictly adhered to, in order to
material on the roof. These personal decontamination procedures shall be
minimize the potential for spreading contamination to the interior of the buildings.
plastic furniture cushions, shall be wet
8. Solid nonporous objects, such as metal patio furniture, plant potters, and wiped, and lightly
wiped with damp rags. Wooden objects such as decking shall be HEPA vacuumed, wet
Woven materials shall
brushed with a bristle brush utilizing simultaneous misting and local HEPA exhaust.
with 29 CFR
either be disposed as ACM or bagged and removed off-site for proper laundering in accordance
waste unless the owner
1901. 1001. Potted plants with visual contamination should be disposed as ACM
made to catch the
requests decontamination. Potted plants will be repeatedly rinsed, and provisions shall be
runoff water (i.e. into ACM disposal bags or by using rags and HEPA wet-vacuums).
washed.
9. After completion of the above, the specified area roof shall be carefully