OCT-08-2002 29:53 NYCDEP BANHM ASB/LEAD TRU ?18 595 3648 P.08
submitted directly to the DEP
An ACP7 form signed by the contractor and air-monitoring firm shall be
representative on site. The DEP shall provide notification to the NYS DOL. The size of the project,
authorization
specified area, shall be indicated on the ACP7 form.. Building owners shall provide written
to the DEP for the work activities.
DEP will coordinate activities with building owners and other city agencies.
The sites and specific areas to be cleaned shall be determined and specified by the DEP.
The contractor shall restrict access by the public to the work area (s) during clean-up activities. Caution
contractor, his
tape and warning signs shall be used to identify work areas. Access shall be limited to the
employees, and Federal, State or local officials.
The contractor shall provide all necessary equipment, to remove, bag, transport, and dispose collected
waste. The contractor is responsible for supplying all necessary equipment.
The specific clean-up procedures for building roofs are attached. The DEP shall consider substitution of
the specified methodologies only if the request is received in writing. Any substitutions must receive
prior approval by the DEP.
shower) shall
For large asbestos clean-up projects, a partial decontamination system (changing room and
decontamination system shall be acceptable
be required at an entry/exit from each work area. A remote
with DEP on-site approval.
tractor
Con Qualifications
The contractor shall have on staff and assigned to the contract a sufficient number of properly trained and
certified workers. See above.