NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/GRM 006367960 - BOX 45/E-mails 2003 M. Gilsenan
Document / 3 pages

E-mails 2003 M. Gilsenan

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000162951–000162953
Page image
Scanned page image, NYC-WTC_000162951
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Gilsenan, Michael From: Dave Stanke ._._._._._._._._._Pii W_._._._._._._. l

Sent: Thursday, February 13, 2003 11:43 AM To: Michael Gilsenan Subject: FW: Revised DEP scope

--Original Message----- [mailto:[email protected]) From: Christopher Warnick Sent: Wednesday, February 12, 2003 9:01 AM Springston; Andrea Seyboth To: Dave Stanke; Denise Sweeney; Jack (E-mail); Andrew Morton (E-mail); Craig Marshall (E-mail); Daniel and Fernandez (E-mail); Karen Sonia Kaner (E-mail); James and Laura Greenspan; Makeupsonia@Earthlink. Net (E-mail); Mark Wainger (E-mail); Lee (E-mail); Sonia Kashuk; Michael Gordon (E-mail); Rhoda Woo; Sarah C. Kerr (E-mail); Steve Kerr (E-mail); Steven Abramson Stephan and Deborah (E-mail); Steven@12east. Corn (E-mail); William Saya Subject: Re: Revised DEP scope

Please find the following responses to the DEP specs.

Denise, please verify insuranse; Contractors General Contractors to provide $10,000.00 Asbestos Abatement 114 Liberty Street Condominium and Liability Insurance coverage listing as additionally insured. Coverage should include property Arnold S. Warwick consider individual Unit Owner damage coverage. You may also want to coverage by the contractor in case of an accident. Disability and Worker's One million dollar automobile liability, Statutory Compensation Coverage to be provided by Contractor.

The following general notes should be added. securing the construction areas a. The Contractor shall be responsible for until the completion of the contract.

neatly, in a systematic manner. b. All Work shall be performed carefully and maintained and kept free c. Existing plumbing lines and drains are to be from blockages to prevent any flooding. framing, conduit, wiring, d. After removing drywall surfaces, all metal shall be protected from any physical damage. piping and cabling to remain shall be fully e. All existing surfaces, appliances and equipment responsibility for damage protected from damage. The contractor shall assume without additional cost to the Owner(s). and shall make repairs required the site. Debris shall be f. No debris shall be allowed to accumulate on the contractor as the job proceeds. Debris removal regularly removed by regulations. shall be in strict accordance with applicable indicated to be saved for g. The Contractor shall carefully protect items re-use.

Responses to DEP Spec items: to "house power" for the #5. All Unit electrical panels will be converted loads requirements ASAP. duration of this work. DEP to provide specific santitzed for use during the cleaning phase. DEP Exiting water tank will be 1

NYC-WTC 000162951

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000162951Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →