NYC 9/11 Public Portal Document
Gilsenan, Michael
From: Dave Stanke ._._._._._._._._._Pii
W_._._._._._._. l
Sent: Thursday, February 13, 2003 11:43 AM
To: Michael Gilsenan
Subject: FW: Revised DEP scope
--Original Message-----
[mailto:[email protected])
From: Christopher Warnick
Sent: Wednesday, February 12, 2003 9:01 AM
Springston; Andrea Seyboth
To: Dave Stanke; Denise Sweeney; Jack
(E-mail); Andrew Morton (E-mail); Craig Marshall (E-mail); Daniel and
Fernandez (E-mail); Karen
Sonia Kaner (E-mail); James and Laura
Greenspan; Makeupsonia@Earthlink. Net (E-mail); Mark Wainger (E-mail);
Lee (E-mail); Sonia Kashuk;
Michael Gordon (E-mail); Rhoda Woo; Sarah C.
Kerr (E-mail); Steve Kerr (E-mail); Steven Abramson
Stephan and Deborah
(E-mail); Steven@12east. Corn (E-mail); William Saya
Subject: Re: Revised DEP scope
Please find the following responses to the DEP specs.
Denise, please verify insuranse;
Contractors General
Contractors to provide $10,000.00 Asbestos Abatement
114 Liberty Street Condominium and
Liability Insurance coverage listing
as additionally insured. Coverage should include property
Arnold S. Warwick
consider individual Unit Owner
damage coverage. You may also want to
coverage by the contractor in case of an accident.
Disability and Worker's
One million dollar automobile liability, Statutory
Compensation Coverage to be provided by Contractor.
The following general notes should be added.
securing the construction areas
a. The Contractor shall be responsible for
until the completion of the contract.
neatly, in a systematic manner.
b. All Work shall be performed carefully and
maintained and kept free
c. Existing plumbing lines and drains are to be
from blockages to prevent any flooding.
framing, conduit, wiring,
d. After removing drywall surfaces, all metal
shall be protected from any physical damage.
piping and cabling
to remain shall be fully
e. All existing surfaces, appliances and equipment
responsibility for damage
protected from damage. The contractor shall assume
without additional cost to the Owner(s).
and shall make repairs required
the site. Debris shall be
f. No debris shall be allowed to accumulate on
the contractor as the job proceeds. Debris removal
regularly removed by
regulations.
shall be in strict accordance with applicable
indicated to be saved for
g. The Contractor shall carefully protect items
re-use.
Responses to DEP Spec items:
to "house power" for the
#5. All Unit electrical panels will be converted
loads requirements ASAP.
duration of this work. DEP to provide specific
santitzed for use during the cleaning phase. DEP
Exiting water tank will be
1
NYC-WTC 000162951