to specify locations of showers ASAP.
glass.
#11. Contractor shall protect window and door frames, and doors and
Contractor shall assume responsibility for repair or replacement of any
damaged window frames, glass, door frames or door panels.
take
#13. Contractor to carefully remove drywall sheeting by hand and to
existing metal ceiling and wall framing.
care not to cause deformation to
remain.
Protect all interior wall materials, surfaces, wires, pipes, etc. to
the
#14. The Ambient Specs call for removal of all wood flooring after
cleaning. Is this a requirement? If so, can this be performed without
re-contaminaiting the site? Note that there are two layers of asbestos
containing tile directly under a significant portion of the hardwood floors
will
(with the exception of the penthouse addition), and that the asbestos
become airborn during the removal of any flooring.
disappear into the
#16. The spray-on fireproofing is soft and loose and may
vacuum. The Contractor should be responsible for replacing any damaged
spray-on fireproofing.
----- Original Message -----
From: "Dave Stanke" <[email protected]>
Sweeney"
To: "Christopher Warnick" <[email protected]>; "Denise
<[email protected]>; "Jack Springston"
<[email protected]>; "Andrea Seyboth (E-mail)"
<[email protected]>; "Andrew Morton (E-mail)" <[email protected]>;
Kaner
"Craig Marshall (E-mail)" <[email protected]>; "Daniel and Sonia
(E-mail)" <[email protected]>; "David Stanke" <[email protected]>;
"James and Laura Fernandez (E-mail)" <[email protected]>; "Karen
Greenspan" <[email protected]>; "Makeupsonia@Earthlink. Net (E-mail)"
<[email protected]>; "Mark Wainger (E-mail)" <[email protected]>;
"Michael Gordon (E-mail)" <[email protected]>; "Rhoda Woo"
<[email protected]>; "Sarah C. Lee (E-mail)" <[email protected]>;
(E-mail)"
"Sonia Kashuk" <[email protected]>; "Stephan and Deborah Kerr
<[email protected]>; "Steve Kerr (E-mail)" <[email protected]>; "Steven
Abramson (E-mail)" <[email protected]>; "Steven@12east. Corn (E-mail)"
<[email protected]>; "William Saya" <[email protected]>
Sent: Tuesday, February 11, 2003 12:44 PM
Subject: RE: Revised DEP scope
> All,
number
> Here are Jack Springston's comments on the DEP scope. There are a
of
for our
> categories of comments highlighted within the text. Some are more
others constitute probable modifications to the scope.
> consideration, and
you
> Please review them and see if there are any make or break issues that
scope. Get back to me directly and quickly with
> feel must be made to the
you have
> these so I can put them together and get back to Jack. Also, if
> any questions or want to speak with Jack directly, let me know.
> Thanks,
> Dave
> -----Original Message-----
> From: Jack Springston [mailto:[email protected]]
> Sent: Monday, February 10, 2003 12:51 PM
> To: Dave Stanke; Denise Sweeney; Christopher Warnick
> Subject: RE: Revised DEP scope
> Importance: High
> Sensitivity: Private
> Dave,
> My comments are highlighted and in CAPS.
NYC-WTC 000162952