Asbestos project monitor and air sampling contract terms, no date

Machine-extracted title · confidence 100%

Detailed contract terms specifying regulatory compliance and certification requirements for monitors and technicians at the World Trade Center site.

NYC-WTC_000151288–000151294

Folder label: “CONTRACTS CONTRACTORS - See: $ matrics etc file

Page image
Scanned page image, NYC-WTC_000151289
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

1. The Project Monitors shall be responsible for accessing a secure EPA Website (url, user name and password to be provided by EPA). From the website, the monitors will be responsible for accessing residential services requested, then scheduling cleaning-up activities and air sampling with the tenants/owners, asbestos abatement contractors and air monitoring technicians to the various apartments. Monitor will then supply relevant information on activities back into the EPA Indoor Air database via the secure EPA website.

2. Air monitoring technicians must be on-site during clean-up activities to collect final clearance samples.

3. The Project Monitor shall ensure that the clean up activities comply with the NYCDEP Scope of Work.

Post Clean-up Air Sampling Procedure must be as followed:

a) Sampling shall not begin until a visual inspection confirms the absence of visible debris.

b) All surfaces must be completely dry prior to the start of sampling.

c) Sampling equipment shall be placed at representative locations within the work area and away from obstructions. The sampling cassette must be placed on a tripod and not taped to existing surfaces.

d) Air conditioning units where applicable shall be run/operated at least 15 minutes prior to the start of sampling. The air conditioning units shall operate continuously throughout the sampling. HVAC systems shall be in operation during sampling.

e) Forced air equipment (e.g. leaf blowers) may be used only after written authorization by the occupant or his/her authorized representative. The project manager shall advise the occupant or his/her authorized representative on the advantages and disadvantages regarding the use of the equipment and obtain the individual’s signature authorizing use. Before the start of sampling, forced air equipment (such as a 1 horsepower leaf blower) maybe used to direct exhaust air against walls, ceilings, floor, ledges and other surfaces. When directing the exhaust, caution shall be taken to minimize disturbance and potential damage to furnishings and personal belongings.

f) One 20-inch fan shall be installed per 10,000 cubic feet of room space and run at low speed. The fan shall operate continuously throughout sampling and shall not be turned off imtil sampling is completed.

NYC-WTC_000151289

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000151289Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000151127 · Box DEP Box 11

A notice instructing that original World Trade Center documents must be preserved as evidence and not disposed of due to potential legal actions.

Filed in the same folder

NYC-WTC_000151141 · Box DEP Box 11

Letter confirming contractor responsibility for cleaning residences and HVAC systems in accordance with project scope.

Filed in the same folder

Compare copies and versions →