SEP-26-2001 12155 MAYOR’S OFC of ENU. COORD 212 999 7024 P.03/03
A4UJU tfixccuiy
cleaned areas.
I
8, Isolation barriers shall be installed between unaffected areas and areas to be cleaned.
9. A third party, who is independent of the asbestos abatement contractor, must perform dr sampling
and analysis. Any person(s) who conducts sampling must possess a valid NYS Asbestos Project Air
Sampling Technician Certificate. Air sampling must be performed in accordance with the
requirements set forth in Title 15. Chapter 1 of the Rules of the City of New York.
10. An “Asbestos Inspection Report” fcrai, ACP 7, shall be submitted directly to the DEP within one-
I week. The aCP 7 must list the emergency clean up q^tities in item 30.
I
I 11. Please note, the disturbance/ removal of in place material 'in the work place is not permitted during
I
clean-up activities unless the Department specifically determines the need to abate damped in place
as part of the clean up. The emergency phase of the project must be completed prior to in place ACM
abatement
If you have any Quosbons or require clarification, please do not hesitate to call the Department at (718)<
DEP-HELP(24hrs/7days).
TOTAL P.03
NYC-WTC_000150128
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000150128Source: NYC Law Department, mirrored locally
Formal memorandum from the DEP Commissioner instructing building representatives on safe asbestos handling and sampling protocols following the disaster.