SEP-26-2001 12!55 MAYOR’S OFC of ENU. COORD 212 999 7024 P.03/03
AUUU CUICQay
• areas. •
.* cleaned
* 8. Isolation barriers shall be installed between unaffected areas and areas to be cleaned.
9. A third party, who is independent of the asbestos abatement contractor, must perform air sampling
and analysis. Any person.(s) who conducts sampling must possess a valid NYS Asbestos Project Air
Sampling Teclmician Certificate, Air sampling must be performed in accordance with the
requirements set forth in Title 15, Chapter 1 of the Rules of the City of New York.
10. An “Asbestos Inspection Report” form, ACP 7, shall be submitted directly to the DEP within one-
weeL The ACP 7 must list the emergency clean up quantities in item 30.
11. Please note, the disturbance/ removal of in place material’in the work place is not permitted during
clean-up activities unless the Department specifically determines the need to abate damaged in place
as part of the clean up. The emergency phase of the project must be completed prior to in place ACM
abatement
DEP^clarification, please do not hesitate to call the Department at (718)^
TOTAL P.03
NYC-WTC_000150087
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000150087Source: NYC Law Department, mirrored locally
Formal memorandum from the DEP Commissioner instructing building representatives on safe asbestos handling and sampling protocols following the disaster.