slmitted to the DEP. The unit should be set up so as to avoid tzacldng of materials
into already
cleaned areas.
S. Isolation barriers shall be installed between unaffected areas and areas to be cleaned_
9. A third party, who is independent of the asbestos abatement contractor, must perform
samplingair
and analysis. Any person(s) who conducts sampling must possess a valid NYS Asbestos Project Air
Sampling Technician Certificate. Air sampling must be performed in accordance with the
requirements set forth in Title 15, Chapter 1 of the Rules of the City of New Yot
10. An "Asbestos Inspection Report" form, ACP 7, shall be submitted directly to the DEP within one-
week. The ACP 7 must list the emergency clean quantities in item 30.
up
ii. Please note, the disturbance/ removal of in place material in the workplace is not permitted during
clean-up activities unless the Department specifically determines the need to abate damaged in place
as part of the clean up. The emergency phase of the project must be completed prior to in place ACM
abatement.
If you have any questions or require clarification, please do not hesitate to call the Department at (718) s
DEP-KELP (24 hrs/7days). .
I
I
I
I
I
I
I
LI
I
I
I
TOTAL P.
I
NYC-WTC 000098639
OCR can misread numbers and units. Confirm readings against the page image before using them.