NYC 9/11 Public Portal Document
i
Commissioner WTC Update for 9/23/01 Activities
South Battery Park areas are still in the cleanup stage. These areas include rector Place
Park and playgroimd, various streets and sidewalks, and the promenade.
Battery Park Conservancy manager, Bob Serpico indicated on 9/22/01 that he would
secure the park at the North Battery Park area until they could conduct samples for
clearance. The park was not secured as of2200 hours on 9/23/01. Various areas along
the promenade from vessey street all the way to just south of 1“ place remain
contaminated. We have prioritized the streets and sidewalk areas followed by the
playground and vehicles and lastly the promenade since the Battery Park Conservancy
indicated they would handle it.
Cleanup work continues to be conducted in the area from Greenwich to Broadway,
between Chambers and Murray. Air monitoring was conducted in this area in an effort
to move the site perimeter from chambers to murray. Four air samples were taken in the
proposed area. Two samples were found to be borderline at the clearance criteria of .01
fibers/cc. One sample was found to be above the criteria. The remaining sample was
found to be below the cleanup criteria. These results were as follows:
Park Place and church .01 fibers/cc
Park Place and Greenwich .014 fibers/cc
Murray and Church .007 fibers/cc
Murray and Greenwich < .01 fibers/cc
Sample results indicate the need to continue to remediate the contamination and perform
additional sampling for clearance. If after additional cleanup the sampling results are
substantially lower than the criteria of .01 fibers/cc we should move to shrink the
chambers street perimeter if the other environmental agencies are in agreement.
Otherwise we would need to conduct additional air monitoring and cleaning until we
achieve this goal.
On 9/24/01 we will continue outdoor remediation of the proposed area and believe it will
be completed sometime on Tuesday afternoon.
We have still not seen the vehicle advisory as promised from DOH.
At 2200 hours DERTA was requested by FDNY to report to the forward command center
to evaluate a condition in the verizon building. DERTA determined the gas odor was
hydrogen sulfide caused by fill decay or sewer gas in the basement of the verizon
building. This condition was then referred to the verizon safety personnel.
NYC-WTC_000148838
OCR can misread numbers and units. Confirm readings against the page image before using them.