NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
NYC-WTC_000146129–000146748Folder label: “EPA OIG LAW”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
DUST PROTECTION AND SUPPRESSION PLAN
2.2 Leaving the Work Area: When personnel leave the work area, they should do the following to prevent spreading dust outside the work area: • Exit work area through designated routes. • Wash boots with soap and water. • If wearing disposable outer protective clothing, dispose of clothing in designated container. • Thoroughly remove dust from clothing using a HEPA vacuum. • Clean personal protective equipment (e.g., respirator, goggles). • At end of shift, replace respirator cartridges. • Wash face and hands with soapy water. · 2.3 Returning Home When workers return ''home" with clothing that has been soiled with dust, they should do the . following to prevent bringing dust into their residence: • Immediately remove clothing soiled with dust. • Place dust soiled clothing in plastic bag(s) until washing. Do not shake dust from clothing. • Launder dust soiled clothes twice and separate from other clothing. • Run machine empty through one (1) complete cycle to rinse any debris that may have been deposited before washing next load. • Dispose of plastic bag(s); do not reuse. • Wash hands with soapy water.
3. DEBRIS/DUST REMOVAL AND LOADING Search/rescue, demolition, and cleanup activities will require the removal of vast quantities of debris that could potentially spread dust within and outside the work area(s). The following dust suppression measures should be used to control the generation and spread of dust: • Minimize handling of debris/dust by avoiding, where possible, multiple handling. • Minimize the drop height of debris from equipment when dumping into haul trucks or onto ground surface. • At locations in or adjacent to rubble piles where debris is separated. by dropping and/or spreading, the rubble should be periodically wet down. • Where practical, aerial mist sprayers should be used to help control dust (e.g., when material is double handled or dumped, in rest areas, in areas where debris is sorted), and· water mist curtains should be used at the perimeter to minimize dust leaving the area. • In areas with thick dust accumulation (including streets and sidewalks), use a truck- mounted, high efficiency particulate air (HEPA) vacuum or, if not available, use standard large volume vacuum trucks. • In areas where vacuum trucks are not used, lightly wet down areas prior to initiating debris/dust removal activities with shovels or other tools/equipment. • Either wet down, or cover and secure debris/dust loads in haul trucks. Haul trucks shall not be allowed to leave the work area unless these measures have been completed. • Assign haul trucks designated routes to and from disposal site(s). • Haul truck speed in work areas should not exceed 10 mph. • Haul routes to disposal sites should be periodically wet down and/or cleaned with "street sweepers" to control dust.
10/15/01 Page3 ofS FINAL
NYC-WTC_000146525
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
21 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
19 shared non-person entities · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000132519
A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.
29 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099112
Invoice from Fiber Control, Inc. dated November 27, 2002, for exterior cleanup services at multiple sites including 113 Nassau Street.
8 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130799
Invoice from Benjamin Kurzban & Son Control, Inc. for roof work completed at 15 Dutch Street.
13 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113167
Invoice from Fiber Control Inc. for cleaning services on the facade of 54 Warren Street.
13 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099818
Billing record for asphalt and gravel roof cleanup services performed at 55 Nassau Street in November 2002.
8 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
12 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119790
Invoice from Fiber Control Inc. for DEP environmental protection services at 14 Barclay Street.
8 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121922
Invoice dated October 2002 for environmental remediation services performed on the exterior of 118 Chambers Street.
9 shared non-person entities · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000148952
Table listing volatile organic compound (VOC) sampling sites and dates outside of Ground Zero from September 2001 to January 2002.
Cited alongside this record in an Ask answer
NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000149199
Department of Environmental Protection advisory letter dated October 25, 2001, addressed to residents of Lower Manhattan.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
NYC-WTC_000105599
Laboratory report detailing asbestos analysis results for samples from 61 Broadway collected in September 2001.
Cited alongside this record in an Ask answer