NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
NYC-WTC_000146129–000146748Folder label: “EPA OIG LAW”

OCR status: ocr · source: ours
NYC 9/11 Public Portal Document ONLY ГYPELE ENIET PEP w.Ryc.gov/dep NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Asbestos Control Progras -17 Junction Boulevard, 8*' Floor, Corona, NY 11368-51 ASBESTOS PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) 1ри.0776Hи0г HOR OTRA USE ON 1. (See foe schodu Exсmpt When submitting this form at the NYC Department of Bulldings, the original form and three (3) copies with origin Signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities. I. FACILITY 2. Address GROUND ZERO @ Vesey and Church Street AKA Path train tunnel beneath former WTC6 5. Type of Facility train tunnel _Borough Manhattan _Zp_10048 3. Block 58 4. Lot_1 _ 6. Name of Buliding North Slurry Wall beneath 6WTC II. BUILDING OWNER 7. NameNew York City Department of Design and Construction B. Contact Person Bob Adams 9. Tel Fax# 10. Address 30-30 Thomson Avenue Clty New York State NY _Zp IIIL. GENERAL CONTRACTOR 11. Name. _ Tel.# IV. ASBESTOS ABATEMENT CONTRACTOR 12. Name Safeway Environmental Corp. 14. Federal Employer IД .15. Te. _13. Contact Person Don Adler Fax 16. Address_1379 Commerce Avenue Clty Bronx State NY _ Zp 10461 V. THIRD PARTY AIR MONITOR . 17. Name ATC Associates 18. Contact Person Fred Burkhardt 19. Federal Employer ID -20. Tel. f Fax/ 21. Address_104 East 25th Street City New York 22. Sample Analysis Laboratory ATC Associates State NY 10010 Zp- 23. NYS DOH ELAP # 10879 VL PROJECT INFORMATION 24. Starting date for this portion of work 2/21/02 Projected completion date 4/21/02 Asbestos work schedule Monday ElTuesday Wednesday El Thursday El Friday Saturday • Sunday Shif from: Z_ Elam 0 pm to 1 _Elam pm pobiy Project is being run 24hours/day 7 dayshweok. Access to inspect the premises must be provided during the work schedule indicated in this ftam. RECEED MAR 07 2002 25. Total amount of asbestos-containing material to be abated during this work O Square Feet, and/or_ 10,800 Linear Feet TRUG СР: 2/200 NYC-WTC_000146425
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
21 shared non-person entities · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
19 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000132519
A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.
29 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
12 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099112
Invoice from Fiber Control, Inc. dated November 27, 2002, for exterior cleanup services at multiple sites including 113 Nassau Street.
8 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130799
Invoice from Benjamin Kurzban & Son Control, Inc. for roof work completed at 15 Dutch Street.
13 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113167
Invoice from Fiber Control Inc. for cleaning services on the facade of 54 Warren Street.
13 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099818
Billing record for asphalt and gravel roof cleanup services performed at 55 Nassau Street in November 2002.
8 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119790
Invoice from Fiber Control Inc. for DEP environmental protection services at 14 Barclay Street.
8 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122774
An invoice from Fiber Control Inc. dated August 2002 for facade services performed at 179 Broadway.
11 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121922
Invoice dated October 2002 for environmental remediation services performed on the exterior of 118 Chambers Street.
9 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000122659
Invoice for roof asbestos abatement work completed at 176 Broadway covering over 77,000 square feet.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111332
NYC DEP form for notifying the department of an asbestos inspection project at a facility.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127430
Invoice from Fiber Control Inc. for facade work at 128 Chambers Street dated September 6, 2002.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128041
Application for roof work at 143 Fulton Street submitted by Benjamin Kurzban & Son Control Inc.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111304
NYC DEP Asbestos Project Notification form for an inspection report submission.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102266
Invoice from Benjaniurzban & Son Inc. submitted to the Department of Environmental Protection on November 9, 2002.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
Cited alongside this record in an Ask answer
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000153382
Document arguing that respirator safety issues fall under OSHA jurisdiction and should be removed from the EPA review.
Cited alongside this record in an Ask answer
NYC-WTC_000138846
OSHA transmits NYS DOL data report containing sample summaries and worker information for WTC.
Cited alongside this record in an Ask answer