NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146415
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document . . a® ‘i NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION | , , Building Dept. 6r TRU No ASBESTOS PROJECT NOTIFICATIO ——_ (ASBESTOS INSPECTION REPORT) 1. Ee yx (See fee schedule) submitting this form at the NYC Department of Buildings, eee ee ee ee ee oe See Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities 2. Address GROUND ZERO - intersection West St. & Liberty St. Borough Manhattan Zip _ 10048 AKA B& level SW comer of Ground Zero cleanup site 3. Block 58 A.tot 1 5. Type of Facility 6. Name of Building Slurry Wall near West St. & Liberty St. fl. BUILDING OWNER 7. Name New York City Department of Design and Construction 8. Contact Person Bob Adams 9. T Fax # ! 140. Address 20-30 Thomson Avenue City New York State NY Zip fil. GENERAL CONTRACTOR 11. Name, Tel. # WV. ASBESTOS ABATEMENT CONTRACTOR ~ 142. Name Safeway Environmental Corp. 13. Contact Person Don Adler 14. Federal Employer (0. 1s. ———— ~~ # 16. Address 1379 Commerce Avenue State NY zip 10461 Vv. ei PARTY AIR MONITOR 21. Address 104 East 25th Street city New York ” gaes BY Zip _10010 22. Sample Analysis Laboratory ATC Associates 23. NYS DOH ELAP # 10879 VL PROJECT INFORMATION 24. Starting date for this portion of work 3/28/02 Projected completion date 4/19/02 Asbestos work schedule [2] Monday [2] Tuesday 4] wednesday ee 1 Friday J Saturday 4] sunday am O pm Shit from: 7s Milam pm to 7 peal Project is being run 24hours/day - 7 days/week . Access to inspect the premises must be provided during the work schedule indicated in this item. 25. Total amount of asbestos-containing material to be abated during this work ___200 square Feet, and/or___——-—- 400 Linear Feat NYC-WTC_000146415

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146415Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →