NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146398
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

AZ :uc J.t . .... 21$# . ........... . . . . . . . . .llll!!llllll!!llll!9llll!lllllllll!B. . . . . . . . . ...,lllll!!9!lll!!ll!._,...._..~_., • asama.e~m~:~•~ 20,CWWW ~

ASBESTOS INSPECTION REPORT (continued) 26. Asbestos Hauler_O_J_M......_Inc_.- - - - - - - - NYS DEC Pennlt # _N_J-_344 _ _ __ Dispose! Slte(s) Imperial Landfill - Route 980 and Boggs Road, Imperial PA

'ZT. This asbestos abatement Is part of a (Item a through e requires filing of this fonn with NYC Department of Buildings) a) D Demolition b) D Boller Replacement c) D Sprinkler Replacement d) D Renovation/Alteration e) D Fireproofing Replacement f) 12) Other (Descrlbe)-..A-.C_.M._.clea-=-n-..u.,.p_.on~!y-------------- 28. TYPE OF ABATEMENT (ChecR all appropriate boxes) D Removal D Enclosure D Encapsulation 0 Repair 121 Clean up 29. ABATEMENT PROCEDURE (Check an appropriate boxes) D Full Containment 0 Glovebag D Tent ~ DEP Variance Application 30. LOCATIONS OF ABATEMENT ---1 ~,11,,~~~u,Jl) DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM' DESCRIPTION OF= WORK BEING Floor(s) OF FLOOR CONTAINING ACM PERFORMED (e.g. entll'e, amt wing, roam f, (e.g. Pipe lagglng, 118111ng. plenum SQUARE LINEAR (e.g. Nlll1lng c:able, lnstalllng fire sprinklers, bolter roam klbbv. etcl dudi&. 111mwm tank8 dadilnn. elc.I FEET FEET ............. and -bollerw elc.l 4th Entire South Side Oust on floors and boxes 2,400 ACM cleanup only

..

31. I hereby declare that the lnfonnatlon provided herein Is true and complete to the best of my knowledge. I am familiar with Federal, State and NYC laws and regulations applicable to asbestos related work.

Parsons Brinkerhoff Quade & Dou. Specialty Service Contracting

~~~ ?l!jer 8/8/02 8/8/02 8/8/02 Date Date Date

32. I understand that as the owner of a buDdlng where asbestos abatement activity occurs, I am responsible for the performance of the asbestos abatement actiYltles In accordance with the Asbestos Program Ru contracted the third party air monitor who Is completely Independent of all parties Involved In the p reb 8clare I have authorized the ~~W~'f'!°~~f::or"arf~~n.of the of The City of New Ynrk

An modification of Information to the NYC DEP ACP. The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened ACP1 thro h the rformance of work In Incremental or lecemeal fashion. 2/2001

. r

NYC-WTC_000146398

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146398Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →